From 4d82a4020f8142266dd1fc9630dae14611d78ac3 Mon Sep 17 00:00:00 2001 From: planner-bot Date: Sat, 11 Apr 2026 23:25:11 +0000 Subject: [PATCH] chore: planner run 2026-04-11 --- knowledge/planner-memory.md | 39 ++++++++++++++++++++----------------- prerequisites.md | 18 +++++++++-------- 2 files changed, 31 insertions(+), 26 deletions(-) diff --git a/knowledge/planner-memory.md b/knowledge/planner-memory.md index e05d5c5..2cb2fdd 100644 --- a/knowledge/planner-memory.md +++ b/knowledge/planner-memory.md @@ -1,4 +1,4 @@ - + # Planner Memory Last updated: 2026-04-11 @@ -6,27 +6,30 @@ Last updated: 2026-04-11 - Run 1 (2026-04-05): First planning run. Established prerequisite tree from VISION.md. - Run 2 (2026-04-08): Foundation milestone completed. Triaged 4 predictor predictions. Filed #425, #426. Focus shifted to Adoption. - Run 3 (2026-04-11): Infrastructure maturity work (#641-#652, #663, #669, #671, #682). Prerequisite tree updated with Foundation+ objective. -- Run 4 (2026-04-11): Foundation+ DONE (#647 closed). Adoption architect DONE (#689, #690 closed). Ops repo migration DONE (#688 closed — vault/evidence/sprints dirs exist). Filed #697 (example project). 0 predictions to triage. +- Run 4 (2026-04-11): Foundation+ DONE (#647 closed). Adoption architect DONE (#689, #690 closed). Ops repo migration DONE (#688 closed). Filed #697 (example project). 0 predictions to triage. +- Run 5 (2026-04-11): #693 (dev-poll deadlock) closed — dev pipeline reliability nearly DONE. #702 (journal hang on Qwen) new bug, in-progress. #665 (edge cold start) promoted to backlog. Priority added to #426, #697. 0 predictions to triage. ## Current constraint focus -1. **Dev-poll deadlock** (#693) — in-progress bug, blocks dev agent reliability in same-container deployments. Being worked by dev-qwen. -2. **Website observability** (#426) — vision. disinto.ai has no analytics. Blocks Adoption landing page AND Ship engagement measurement. Two downstream objectives. -3. **Example project** (#697) — vision. Now unblocked by #688. Needs architect decomposition. Key Adoption deliverable and onboarding asset. -4. **Deploy profiles** — not started. Vision-level design needed. Blocks Ship milestone. -5. **Assumptions register** — not started. Blocks Ship milestone. +1. **Website observability** (#426) — vision, priority. disinto.ai has no analytics. Blocks Adoption landing page AND Ship engagement measurement. Two downstream objectives. Longest-standing constraint. +2. **Example project** (#697) — vision, priority. Needs architect decomposition. Key Adoption deliverable and onboarding asset. +3. **Edge cold-start crash** (#665) — backlog. Edge container clones from forgejo before forgejo is ready. Blocks clean bootstrap. Simple fix (retry/wait loop). +4. **Profile journal hang** (#702) — in-progress. Journal digestion hangs on local Qwen with many entries. Affects dev-agent reliability. +5. **Deploy profiles** — not started. Vision-level design needed. Blocks Ship milestone. ## Patterns observed -- Foundation milestone completed in ~10 days (2026-03-28 to 2026-04-08). Foundation+ completed in ~3 days (2026-04-08 to 2026-04-11). Infrastructure maturity accelerating. -- Predictor-planner loop working: 7 predictions triaged across runs 2-3, all actioned. No new predictions in run 4. -- Architect lifecycle now complete: #689 (close parent vision) and #690 (signature bug) both fixed. Architect can now decompose vision issues into sprints autonomously. -- Ops repo structural debt resolved: #688 closed, migrate_ops_repo() auto-triggers on startup. All canonical dirs present (vault/pending|approved|fired|rejected, evidence/*, sprints/). -- No observables exist — all addressables (website, repo, skill, github org) lack measurement. This remains the fundamental gap between Adoption and Ship. -- Graph healthy: 207 nodes, 240 edges, no cycles, no bottlenecks. Orphans are benign (closed issues, unused formulas/labels). +- Foundation completed in ~10 days, Foundation+ in ~3 days. Infrastructure maturity accelerating. +- Predictor-planner loop working: 7 predictions triaged across runs 2-3. No new predictions in runs 4-5. Either predictor interval is too infrequent or system is stable. +- Architect lifecycle complete (#689, #690 fixed). Can autonomously decompose vision issues into sprints. +- Dev pipeline nearly reliable: #693 deadlock fixed. #702 (Qwen journal hang) is the remaining operational issue. +- No observables exist — all addressables (website, repo, skill, github org) lack measurement. Fundamental gap between Adoption and Ship. +- Graph healthy: 206 nodes, 246 edges, no cycles, no bottlenecks. Orphans are benign. +- Massive fix velocity: 30+ issues closed 2026-04-10 to 2026-04-11 (infrastructure, credential, profile, entrypoint fixes). ## Strategic direction - Foundation and Foundation+ both DONE. Adoption is the active milestone. -- Three Adoption objectives DONE (Forgejo+CI, architect lifecycle, bootstrap infrastructure). Three remain: landing page (#426), example project (#697), bootstrap verification. -- #693 (dev-poll deadlock) is the only active bug — if resolved, dev pipeline is fully reliable. -- #697 and #426 are both vision-level — architect should decompose them into sprint issues. -- Do NOT file Ship/Learn issues until Adoption objectives show progress. Predictor will check. -- RESOURCES.md and portfolio.md are empty placeholders — low priority but should be populated as addressables/observables materialize. +- Four Adoption objectives DONE (Forgejo+CI, architect lifecycle, bootstrap infrastructure, dev pipeline reliability). Three remain: landing page (#426), example project (#697), bootstrap cold-start (#665). +- #426 and #697 are both vision-level — architect should decompose them into sprint issues. Both now have priority label. +- #665 is a simple bug now in backlog — should be picked up by next dev-agent run. +- #702 is being actively worked — monitor but don't interfere. +- Do NOT file Ship/Learn issues until Adoption objectives show progress. +- RESOURCES.md and portfolio.md remain empty placeholders — populate as addressables/observables materialize. diff --git a/prerequisites.md b/prerequisites.md index fcc2f71..86de8f5 100644 --- a/prerequisites.md +++ b/prerequisites.md @@ -18,7 +18,7 @@ Status: DONE ## Objective: Foundation — Planner gap analysis against vision - [x] Planner formula exists (run-planner.toml v4) - [x] planner-run.sh cron wrapper exists -- [x] Planning runs established (runs 1–4) +- [x] Planning runs established (runs 1–5) Status: DONE ## Objective: Foundation — Multi-project support @@ -29,7 +29,7 @@ Status: DONE ## Objective: Foundation — Knowledge graph for structural defect detection - [x] networkx package installed in agents container (#220 — closed) - [x] build-graph.py exists in lib/ -- [x] Graph report generating successfully (207 nodes, 240 edges as of 2026-04-11) +- [x] Graph report generating successfully (206 nodes, 246 edges as of 2026-04-11) Status: DONE ## Objective: Foundation — Predictor-planner adversarial feedback loop @@ -57,8 +57,9 @@ Status: DONE - [x] Prediction labels created during init (#225 — closed) - [x] Ops repo migration code merged (#425 — closed) - [x] Ops repo migration auto-triggers on agent startup (#688 — closed) -- [ ] End-to-end bootstrap verification with example project (#697 — vision) -Status: READY — migration works, needs end-to-end verification +- [ ] Edge container cold-start crash (#665 — backlog) +- [ ] End-to-end bootstrap verification with example project (#697 — vision, priority) +Status: READY — migration works, #665 blocks clean cold-start, #697 needs architect decomposition ## Objective: Adoption — Built-in Forgejo + Woodpecker CI - [x] Docker compose with Forgejo + Woodpecker @@ -68,12 +69,12 @@ Status: DONE ## Objective: Adoption — Landing page communicating value proposition - [x] Website addressable exists (disinto.ai) -- [ ] Website observability — no engagement measurement (#426 — vision) +- [ ] Website observability — no engagement measurement (#426 — vision, priority) Status: BLOCKED — no evidence process connected to website ## Objective: Adoption — Example project demonstrating full lifecycle - [x] Bootstrap path unblocked (#688 — closed) -- [ ] Example project design and implementation (#697 — vision) +- [ ] Example project design and implementation (#697 — vision, priority) Status: BLOCKED — #697 needs architect decomposition ## Objective: Adoption — Architect lifecycle completeness @@ -82,8 +83,9 @@ Status: BLOCKED — #697 needs architect decomposition Status: DONE ## Objective: Adoption — Dev agent pipeline reliability -- [ ] Dev-poll deadlock in same-container case (#693 — in-progress) -Status: BLOCKED — #693 being worked by dev-qwen +- [x] Dev-poll deadlock in same-container case (#693 — closed) +- [ ] Profile journal digestion hang on Qwen (#702 — in-progress) +Status: READY — #693 fixed, #702 being worked ## Objective: Ship (Fold 2) — Deploy profiles per artifact type - [ ] No deploy profiles defined