chore: planner run 2026-04-08
This commit is contained in:
parent
d033dff89e
commit
e756c3eae9
2 changed files with 54 additions and 47 deletions
|
|
@ -1,26 +1,28 @@
|
|||
<!-- summarized-through-run: 1 -->
|
||||
<!-- summarized-through-run: 2 -->
|
||||
# Planner Memory
|
||||
Last updated: 2026-04-05
|
||||
Last updated: 2026-04-08
|
||||
|
||||
## Run history
|
||||
- Run 1 (2026-04-05): First planning run. Established prerequisite tree from VISION.md.
|
||||
- Run 2 (2026-04-08): Foundation milestone completed. All 5 blockers resolved. Triaged 4 predictor predictions (all actioned). Filed #425 (ops repo migration) and #426 (website observability). Focus shifted to Adoption milestone.
|
||||
|
||||
## Current constraint focus
|
||||
1. **Stale in-progress pipeline** (#224) — 12 stuck issues from failed dev-agent sessions block pipeline throughput. This is the #1 bottleneck.
|
||||
2. **Missing networkx** (#220) — blocks graph-driven analysis for all nervous-system agents (gardener, architect, planner).
|
||||
3. **Prediction workflow labels** (#225) — predictor-planner adversarial loop cannot function without forge labels.
|
||||
4. **Architect .profile integration** (#222) — architect can't learn across sessions. Dep #214 is now closed.
|
||||
5. **Woodpecker OAuth** (#172, #178) — CI pipeline broken, both issues stuck in-progress.
|
||||
1. **Ops repo migration** (#425) — existing deployments missing evidence/, sprints/, portfolio.md, RESOURCES.md, vault subdirs. Blocks evidence collection for all agents. Priority+backlog.
|
||||
2. **Website observability** (#426) — disinto.ai has no analytics/measurement. Blocks Adoption landing page and Ship engagement measurement. Vision-level (design decisions needed).
|
||||
3. **Example project** — none exists. Blocked on bootstrap verification after #425.
|
||||
4. **Deploy profiles** — not started. Vision-level design needed for per-artifact-type deployment.
|
||||
5. **Assumptions register** — not started. Ship (Fold 2) prerequisite.
|
||||
|
||||
## Patterns observed
|
||||
- High volume of bugs from initial bootstrap/deploy phase (issues #150-#200 are mostly infra/setup fixes)
|
||||
- Dev-agent `no_push` failure mode is systemic — sessions fail silently and leave issues stuck
|
||||
- The factory is in early Foundation phase: core loop partially works but reliability is low
|
||||
- No predictions have been filed yet — predictor may not be running or labels are the blocker
|
||||
- No observables exist — all addressables (website, repo, skill, github org) lack measurement
|
||||
- Foundation milestone completed in ~10 days (2026-03-28 to 2026-04-08). High bug fix velocity once dev-agent pipeline was reliable.
|
||||
- Predictor-planner loop working: predictor filed 4 accurate predictions, planner actioned all 4. The adversarial feedback catches stale state and planner drift effectively.
|
||||
- Predictor correctly identified planner filing Fold 2/3 vision issues (#418, #419) while Foundation was incomplete — planner must verify milestone completion before advancing.
|
||||
- Ops repo structural debt: setup_ops_repo() creates dirs for new repos but doesn't migrate existing ones. Pattern will recur with future schema changes.
|
||||
- No observables exist — all 4 addressables (website, repo, skill, github org) lack measurement. This is the fundamental gap between Adoption and Ship.
|
||||
|
||||
## Strategic direction
|
||||
- Foundation milestone is the priority. Ship and Learn milestones are blocked on Foundation.
|
||||
- Focus on pipeline reliability: stale issue recovery (#224) > networkx (#220) > prediction labels (#225)
|
||||
- Adoption milestone has multiple init/CI bugs that need sequential fixes before bootstrap works cleanly
|
||||
- RESOURCES.md does not exist in ops repo — should be created to track factory capabilities
|
||||
- Foundation DONE. Adoption is now the active milestone.
|
||||
- #425 is the single blocking issue — once ops repo dirs exist, evidence collection unblocks and bootstrap is complete.
|
||||
- After #425: focus on example project (demonstrates full lifecycle) and website observability (#426).
|
||||
- Do NOT file Ship/Learn issues until Adoption objectives show progress. Predictor will check.
|
||||
- Graph report is healthy: 165 nodes, 137 edges, no cycles, no bottlenecks. 7 orphans are benign (closed issues, unused formulas/labels).
|
||||
|
|
|
|||