From 2ad6c8d45e08a78dd757016d1cbe0039506e1bcb Mon Sep 17 00:00:00 2001 From: planner-bot Date: Sat, 11 Apr 2026 20:38:30 +0000 Subject: [PATCH 1/5] chore: planner run 2026-04-11 MIME-Version: 1.0 Content-Type: text/plain; charset=UTF-8 Content-Transfer-Encoding: 8bit - Triaged 3 predictions (#466, #467, #468 — all actioned) - Filed #688 (ops repo auto-migration) and #689 (architect lifecycle) - Promoted #647 (remove external flock) from vision to backlog - Updated prerequisite tree: Foundation+ infra maturity objective added, graph stats updated (208 nodes, 245 edges), #688 replaces #425 as blocker Co-Authored-By: Claude Opus 4.6 --- prerequisites.md | 31 ++++++++++++++++++++++--------- 1 file changed, 22 insertions(+), 9 deletions(-) diff --git a/prerequisites.md b/prerequisites.md index d61ecf6..39fb8d7 100644 --- a/prerequisites.md +++ b/prerequisites.md @@ -1,5 +1,5 @@ # Prerequisite Tree - + ## Objective: Foundation — Core agent loop (dev → CI → review → merge) - [x] dev-agent picks up backlog issues (dev/dev-agent.sh exists) @@ -18,7 +18,7 @@ Status: DONE ## Objective: Foundation — Planner gap analysis against vision - [x] Planner formula exists (run-planner.toml v4) - [x] planner-run.sh cron wrapper exists -- [x] Planning runs established and maintaining prerequisite tree (run 1: 2026-04-05, run 2: 2026-04-08) +- [x] Planning runs established (run 1: 2026-04-05, run 2: 2026-04-08, run 3: 2026-04-11) Status: DONE ## Objective: Foundation — Multi-project support @@ -29,24 +29,33 @@ Status: DONE ## Objective: Foundation — Knowledge graph for structural defect detection - [x] networkx package installed in agents container (#220 — closed) - [x] build-graph.py exists in lib/ -- [x] Graph report generating successfully (165 nodes, 137 edges as of 2026-04-08) +- [x] Graph report generating successfully (208 nodes, 245 edges as of 2026-04-11) Status: DONE ## Objective: Foundation — Predictor-planner adversarial feedback loop - [x] Predictor formula exists (run-predictor.toml) - [x] Planner prediction triage step defined - [x] Prediction workflow labels created on Forgejo (#225 — closed) -- [x] Predictor filing predictions (4 predictions triaged in run 2) +- [x] Predictor filing predictions (7 predictions triaged across runs 2-3) Status: DONE ## --- FOUNDATION MILESTONE: DONE --- +## Objective: Foundation+ — Infrastructure maturity +- [x] CLAUDE_CONFIG_DIR rollout (#641-#646 — all closed) +- [x] Credential handling cleanup (#669, #671 — closed) +- [x] Agent profile/journal fixes (#651, #652, #663 — closed) +- [x] Cron intervals configured (#682 — closed) +- [ ] Remove external flock once CLAUDE_CONFIG_DIR verified (#647 — vision, now READY) +Status: READY — #647 is actionable now that CLAUDE_CONFIG_DIR is deployed + ## Objective: Adoption — One-command bootstrap (disinto init → disinto up) - [x] disinto init re-run stability (#158 — closed) - [x] disinto init repo creation API endpoint (#164 — closed) - [x] Prediction labels created during init (#225 — closed) -- [ ] Ops repo migration for existing deployments (#425 — backlog+priority) -Status: BLOCKED — #425 ops repo missing dirs on existing deployments +- [x] Ops repo migration code merged (#425 — closed) +- [ ] Ops repo migration auto-triggers on agent startup (#688 — backlog+priority) +Status: BLOCKED — #688 ensure_ops_repo doesn't call migrate_ops_repo; live env still missing dirs ## Objective: Adoption — Built-in Forgejo + Woodpecker CI - [x] Docker compose with Forgejo + Woodpecker @@ -61,9 +70,13 @@ Status: BLOCKED — no evidence process connected to website ## Objective: Adoption — Example project demonstrating full lifecycle - [ ] No example project exists -- [ ] Requires verified bootstrap (#425) +- [ ] Requires verified bootstrap (#688) Status: BLOCKED — depends on bootstrap completion and ops repo migration +## Objective: Adoption — Architect lifecycle completeness +- [ ] Architect closes parent vision issues when sprint sub-issues complete (#689 — backlog) +Status: BLOCKED — #689 not yet implemented + ## Objective: Ship (Fold 2) — Deploy profiles per artifact type - [ ] No deploy profiles defined - [x] CI pipeline working (Woodpecker OAuth fixed) @@ -72,8 +85,8 @@ Status: BLOCKED — not started, needs design (vision-level) ## Objective: Ship (Fold 2) — Vault-gated fold transitions - [x] Vault redesign complete (#73-#77 — all closed) - [x] Vault PR workflow documented (docs/VAULT.md) -- [ ] Vault directories complete in ops repo (#425 — approved/fired/rejected missing) -Status: BLOCKED — #425 ops repo dirs needed for vault workflow +- [ ] Vault directories complete in ops repo (#688 — approved/fired/rejected missing) +Status: BLOCKED — #688 ops repo dirs needed for vault workflow ## Objective: Ship (Fold 2) — Engagement measurement baked into deploy pipelines - [ ] No engagement measurement exists From 1546540872bcba2ff8baf948cda8dc6e3b6ae93e Mon Sep 17 00:00:00 2001 From: planner-bot Date: Sat, 11 Apr 2026 22:12:52 +0000 Subject: [PATCH 2/5] chore: migrate ops repo structure to canonical layout --- RESOURCES.md | 5 +++++ evidence/engagement/.gitkeep | 0 evidence/evolution/.gitkeep | 0 evidence/holdout/.gitkeep | 0 evidence/red-team/.gitkeep | 0 evidence/user-test/.gitkeep | 0 knowledge/.gitkeep | 0 portfolio.md | 5 +++++ sprints/.gitkeep | 0 vault/approved/.gitkeep | 0 vault/fired/.gitkeep | 0 vault/pending/.gitkeep | 0 vault/rejected/.gitkeep | 0 13 files changed, 10 insertions(+) create mode 100644 RESOURCES.md create mode 100644 evidence/engagement/.gitkeep create mode 100644 evidence/evolution/.gitkeep create mode 100644 evidence/holdout/.gitkeep create mode 100644 evidence/red-team/.gitkeep create mode 100644 evidence/user-test/.gitkeep create mode 100644 knowledge/.gitkeep create mode 100644 portfolio.md create mode 100644 sprints/.gitkeep create mode 100644 vault/approved/.gitkeep create mode 100644 vault/fired/.gitkeep create mode 100644 vault/pending/.gitkeep create mode 100644 vault/rejected/.gitkeep diff --git a/RESOURCES.md b/RESOURCES.md new file mode 100644 index 0000000..aae9292 --- /dev/null +++ b/RESOURCES.md @@ -0,0 +1,5 @@ +# RESOURCES + +## Overview + + diff --git a/evidence/engagement/.gitkeep b/evidence/engagement/.gitkeep new file mode 100644 index 0000000..e69de29 diff --git a/evidence/evolution/.gitkeep b/evidence/evolution/.gitkeep new file mode 100644 index 0000000..e69de29 diff --git a/evidence/holdout/.gitkeep b/evidence/holdout/.gitkeep new file mode 100644 index 0000000..e69de29 diff --git a/evidence/red-team/.gitkeep b/evidence/red-team/.gitkeep new file mode 100644 index 0000000..e69de29 diff --git a/evidence/user-test/.gitkeep b/evidence/user-test/.gitkeep new file mode 100644 index 0000000..e69de29 diff --git a/knowledge/.gitkeep b/knowledge/.gitkeep new file mode 100644 index 0000000..e69de29 diff --git a/portfolio.md b/portfolio.md new file mode 100644 index 0000000..7158d78 --- /dev/null +++ b/portfolio.md @@ -0,0 +1,5 @@ +# Portfolio + +## Overview + + diff --git a/sprints/.gitkeep b/sprints/.gitkeep new file mode 100644 index 0000000..e69de29 diff --git a/vault/approved/.gitkeep b/vault/approved/.gitkeep new file mode 100644 index 0000000..e69de29 diff --git a/vault/fired/.gitkeep b/vault/fired/.gitkeep new file mode 100644 index 0000000..e69de29 diff --git a/vault/pending/.gitkeep b/vault/pending/.gitkeep new file mode 100644 index 0000000..e69de29 diff --git a/vault/rejected/.gitkeep b/vault/rejected/.gitkeep new file mode 100644 index 0000000..e69de29 From 85fecd7c2e21afde5972c8d78a0750d027883e8b Mon Sep 17 00:00:00 2001 From: planner-bot Date: Sat, 11 Apr 2026 22:17:43 +0000 Subject: [PATCH 3/5] chore: planner run 2026-04-11 (run 4) Foundation+ DONE, Adoption architect DONE, ops migration DONE. Filed #697 (example project). Updated tree and memory. Co-Authored-By: Claude Opus 4.6 --- knowledge/planner-memory.md | 38 ++++++++++++++++++++----------------- prerequisites.md | 35 +++++++++++++++++++++------------- 2 files changed, 43 insertions(+), 30 deletions(-) diff --git a/knowledge/planner-memory.md b/knowledge/planner-memory.md index 10414e3..e05d5c5 100644 --- a/knowledge/planner-memory.md +++ b/knowledge/planner-memory.md @@ -1,28 +1,32 @@ - + # Planner Memory -Last updated: 2026-04-08 +Last updated: 2026-04-11 ## Run history - Run 1 (2026-04-05): First planning run. Established prerequisite tree from VISION.md. -- Run 2 (2026-04-08): Foundation milestone completed. All 5 blockers resolved. Triaged 4 predictor predictions (all actioned). Filed #425 (ops repo migration) and #426 (website observability). Focus shifted to Adoption milestone. +- Run 2 (2026-04-08): Foundation milestone completed. Triaged 4 predictor predictions. Filed #425, #426. Focus shifted to Adoption. +- Run 3 (2026-04-11): Infrastructure maturity work (#641-#652, #663, #669, #671, #682). Prerequisite tree updated with Foundation+ objective. +- Run 4 (2026-04-11): Foundation+ DONE (#647 closed). Adoption architect DONE (#689, #690 closed). Ops repo migration DONE (#688 closed — vault/evidence/sprints dirs exist). Filed #697 (example project). 0 predictions to triage. ## Current constraint focus -1. **Ops repo migration** (#425) — existing deployments missing evidence/, sprints/, portfolio.md, RESOURCES.md, vault subdirs. Blocks evidence collection for all agents. Priority+backlog. -2. **Website observability** (#426) — disinto.ai has no analytics/measurement. Blocks Adoption landing page and Ship engagement measurement. Vision-level (design decisions needed). -3. **Example project** — none exists. Blocked on bootstrap verification after #425. -4. **Deploy profiles** — not started. Vision-level design needed for per-artifact-type deployment. -5. **Assumptions register** — not started. Ship (Fold 2) prerequisite. +1. **Dev-poll deadlock** (#693) — in-progress bug, blocks dev agent reliability in same-container deployments. Being worked by dev-qwen. +2. **Website observability** (#426) — vision. disinto.ai has no analytics. Blocks Adoption landing page AND Ship engagement measurement. Two downstream objectives. +3. **Example project** (#697) — vision. Now unblocked by #688. Needs architect decomposition. Key Adoption deliverable and onboarding asset. +4. **Deploy profiles** — not started. Vision-level design needed. Blocks Ship milestone. +5. **Assumptions register** — not started. Blocks Ship milestone. ## Patterns observed -- Foundation milestone completed in ~10 days (2026-03-28 to 2026-04-08). High bug fix velocity once dev-agent pipeline was reliable. -- Predictor-planner loop working: predictor filed 4 accurate predictions, planner actioned all 4. The adversarial feedback catches stale state and planner drift effectively. -- Predictor correctly identified planner filing Fold 2/3 vision issues (#418, #419) while Foundation was incomplete — planner must verify milestone completion before advancing. -- Ops repo structural debt: setup_ops_repo() creates dirs for new repos but doesn't migrate existing ones. Pattern will recur with future schema changes. -- No observables exist — all 4 addressables (website, repo, skill, github org) lack measurement. This is the fundamental gap between Adoption and Ship. +- Foundation milestone completed in ~10 days (2026-03-28 to 2026-04-08). Foundation+ completed in ~3 days (2026-04-08 to 2026-04-11). Infrastructure maturity accelerating. +- Predictor-planner loop working: 7 predictions triaged across runs 2-3, all actioned. No new predictions in run 4. +- Architect lifecycle now complete: #689 (close parent vision) and #690 (signature bug) both fixed. Architect can now decompose vision issues into sprints autonomously. +- Ops repo structural debt resolved: #688 closed, migrate_ops_repo() auto-triggers on startup. All canonical dirs present (vault/pending|approved|fired|rejected, evidence/*, sprints/). +- No observables exist — all addressables (website, repo, skill, github org) lack measurement. This remains the fundamental gap between Adoption and Ship. +- Graph healthy: 207 nodes, 240 edges, no cycles, no bottlenecks. Orphans are benign (closed issues, unused formulas/labels). ## Strategic direction -- Foundation DONE. Adoption is now the active milestone. -- #425 is the single blocking issue — once ops repo dirs exist, evidence collection unblocks and bootstrap is complete. -- After #425: focus on example project (demonstrates full lifecycle) and website observability (#426). +- Foundation and Foundation+ both DONE. Adoption is the active milestone. +- Three Adoption objectives DONE (Forgejo+CI, architect lifecycle, bootstrap infrastructure). Three remain: landing page (#426), example project (#697), bootstrap verification. +- #693 (dev-poll deadlock) is the only active bug — if resolved, dev pipeline is fully reliable. +- #697 and #426 are both vision-level — architect should decompose them into sprint issues. - Do NOT file Ship/Learn issues until Adoption objectives show progress. Predictor will check. -- Graph report is healthy: 165 nodes, 137 edges, no cycles, no bottlenecks. 7 orphans are benign (closed issues, unused formulas/labels). +- RESOURCES.md and portfolio.md are empty placeholders — low priority but should be populated as addressables/observables materialize. diff --git a/prerequisites.md b/prerequisites.md index 39fb8d7..fcc2f71 100644 --- a/prerequisites.md +++ b/prerequisites.md @@ -18,7 +18,7 @@ Status: DONE ## Objective: Foundation — Planner gap analysis against vision - [x] Planner formula exists (run-planner.toml v4) - [x] planner-run.sh cron wrapper exists -- [x] Planning runs established (run 1: 2026-04-05, run 2: 2026-04-08, run 3: 2026-04-11) +- [x] Planning runs established (runs 1–4) Status: DONE ## Objective: Foundation — Multi-project support @@ -29,7 +29,7 @@ Status: DONE ## Objective: Foundation — Knowledge graph for structural defect detection - [x] networkx package installed in agents container (#220 — closed) - [x] build-graph.py exists in lib/ -- [x] Graph report generating successfully (208 nodes, 245 edges as of 2026-04-11) +- [x] Graph report generating successfully (207 nodes, 240 edges as of 2026-04-11) Status: DONE ## Objective: Foundation — Predictor-planner adversarial feedback loop @@ -46,16 +46,19 @@ Status: DONE - [x] Credential handling cleanup (#669, #671 — closed) - [x] Agent profile/journal fixes (#651, #652, #663 — closed) - [x] Cron intervals configured (#682 — closed) -- [ ] Remove external flock once CLAUDE_CONFIG_DIR verified (#647 — vision, now READY) -Status: READY — #647 is actionable now that CLAUDE_CONFIG_DIR is deployed +- [x] Remove external flock (#647 — closed) +Status: DONE + +## --- FOUNDATION+ MILESTONE: DONE --- ## Objective: Adoption — One-command bootstrap (disinto init → disinto up) - [x] disinto init re-run stability (#158 — closed) - [x] disinto init repo creation API endpoint (#164 — closed) - [x] Prediction labels created during init (#225 — closed) - [x] Ops repo migration code merged (#425 — closed) -- [ ] Ops repo migration auto-triggers on agent startup (#688 — backlog+priority) -Status: BLOCKED — #688 ensure_ops_repo doesn't call migrate_ops_repo; live env still missing dirs +- [x] Ops repo migration auto-triggers on agent startup (#688 — closed) +- [ ] End-to-end bootstrap verification with example project (#697 — vision) +Status: READY — migration works, needs end-to-end verification ## Objective: Adoption — Built-in Forgejo + Woodpecker CI - [x] Docker compose with Forgejo + Woodpecker @@ -69,13 +72,18 @@ Status: DONE Status: BLOCKED — no evidence process connected to website ## Objective: Adoption — Example project demonstrating full lifecycle -- [ ] No example project exists -- [ ] Requires verified bootstrap (#688) -Status: BLOCKED — depends on bootstrap completion and ops repo migration +- [x] Bootstrap path unblocked (#688 — closed) +- [ ] Example project design and implementation (#697 — vision) +Status: BLOCKED — #697 needs architect decomposition ## Objective: Adoption — Architect lifecycle completeness -- [ ] Architect closes parent vision issues when sprint sub-issues complete (#689 — backlog) -Status: BLOCKED — #689 not yet implemented +- [x] Architect closes parent vision issues when sprint sub-issues complete (#689 — closed) +- [x] Architect-run.sh signature bug fixed (#690 — closed) +Status: DONE + +## Objective: Adoption — Dev agent pipeline reliability +- [ ] Dev-poll deadlock in same-container case (#693 — in-progress) +Status: BLOCKED — #693 being worked by dev-qwen ## Objective: Ship (Fold 2) — Deploy profiles per artifact type - [ ] No deploy profiles defined @@ -85,8 +93,9 @@ Status: BLOCKED — not started, needs design (vision-level) ## Objective: Ship (Fold 2) — Vault-gated fold transitions - [x] Vault redesign complete (#73-#77 — all closed) - [x] Vault PR workflow documented (docs/VAULT.md) -- [ ] Vault directories complete in ops repo (#688 — approved/fired/rejected missing) -Status: BLOCKED — #688 ops repo dirs needed for vault workflow +- [x] Vault directories complete in ops repo (#688 — closed) +- [ ] Fold transition logic not implemented +Status: BLOCKED — needs design for fold gate mechanics ## Objective: Ship (Fold 2) — Engagement measurement baked into deploy pipelines - [ ] No engagement measurement exists From 84da19ea42d8956cd65cc40298405207ca185166 Mon Sep 17 00:00:00 2001 From: planner-bot Date: Sun, 12 Apr 2026 02:06:46 +0000 Subject: [PATCH 4/5] chore: planner run 2026-04-12 --- prerequisites.md | 25 +++++++++++++++++++++---- 1 file changed, 21 insertions(+), 4 deletions(-) diff --git a/prerequisites.md b/prerequisites.md index fcc2f71..c57cfec 100644 --- a/prerequisites.md +++ b/prerequisites.md @@ -1,5 +1,5 @@ # Prerequisite Tree - + ## Objective: Foundation — Core agent loop (dev → CI → review → merge) - [x] dev-agent picks up backlog issues (dev/dev-agent.sh exists) @@ -29,7 +29,7 @@ Status: DONE ## Objective: Foundation — Knowledge graph for structural defect detection - [x] networkx package installed in agents container (#220 — closed) - [x] build-graph.py exists in lib/ -- [x] Graph report generating successfully (207 nodes, 240 edges as of 2026-04-11) +- [x] Graph report generating successfully (213 nodes, 295 edges as of 2026-04-12) Status: DONE ## Objective: Foundation — Predictor-planner adversarial feedback loop @@ -79,11 +79,28 @@ Status: BLOCKED — #697 needs architect decomposition ## Objective: Adoption — Architect lifecycle completeness - [x] Architect closes parent vision issues when sprint sub-issues complete (#689 — closed) - [x] Architect-run.sh signature bug fixed (#690 — closed) +- [x] Architect review response handling fixed (#718 — closed) +- [x] Architect URL construction fixed (#717 — closed) +- [x] Architect pitch output fixed (#716 — closed) Status: DONE ## Objective: Adoption — Dev agent pipeline reliability -- [ ] Dev-poll deadlock in same-container case (#693 — in-progress) -Status: BLOCKED — #693 being worked by dev-qwen +- [x] Dev-poll deadlock in same-container case (#693 — closed) +- [x] Profile journal digestion hang (#702 — closed) +Status: DONE + +## Objective: Adoption — Assistant (disinto-chat) (#623) +- [x] Caddy subpath routing skeleton (#704 — closed) +- [x] Chat container scaffold (#705 — closed) +- [x] Chat sandbox hardening (#706 — closed) +- [ ] Claude identity isolation (#707 — in-progress) +- [ ] Forgejo OAuth gate (#708 — in-progress) +- [ ] Caddy Remote-User forwarding + validation (#709 — backlog) +- [ ] Conversation history persistence (#710 — backlog) +- [ ] Cost caps + rate limiting (#711 — backlog) +- [ ] Escalation tools (#712 — backlog) +- [ ] Per-project subdomain fallback (#713 — backlog) +Status: IN PROGRESS — 3/10 sub-issues closed, 2 in-progress, 5 backlog ## Objective: Ship (Fold 2) — Deploy profiles per artifact type - [ ] No deploy profiles defined From 6219d7bdf0ee2fca24dd3b0f78959c00b9b29fad Mon Sep 17 00:00:00 2001 From: planner-bot Date: Sun, 12 Apr 2026 03:34:08 +0000 Subject: [PATCH 5/5] chore: planner run 2026-04-12 --- prerequisites.md | 24 ++++++++++++------------ 1 file changed, 12 insertions(+), 12 deletions(-) diff --git a/prerequisites.md b/prerequisites.md index c57cfec..addcc31 100644 --- a/prerequisites.md +++ b/prerequisites.md @@ -18,7 +18,7 @@ Status: DONE ## Objective: Foundation — Planner gap analysis against vision - [x] Planner formula exists (run-planner.toml v4) - [x] planner-run.sh cron wrapper exists -- [x] Planning runs established (runs 1–4) +- [x] Planning runs established (runs 1–5) Status: DONE ## Objective: Foundation — Multi-project support @@ -29,7 +29,7 @@ Status: DONE ## Objective: Foundation — Knowledge graph for structural defect detection - [x] networkx package installed in agents container (#220 — closed) - [x] build-graph.py exists in lib/ -- [x] Graph report generating successfully (213 nodes, 295 edges as of 2026-04-12) +- [x] Graph report generating successfully (206 nodes, 276 edges as of 2026-04-12) Status: DONE ## Objective: Foundation — Predictor-planner adversarial feedback loop @@ -68,12 +68,12 @@ Status: DONE ## Objective: Adoption — Landing page communicating value proposition - [x] Website addressable exists (disinto.ai) -- [ ] Website observability — no engagement measurement (#426 — vision) +- [ ] Website observability — no engagement measurement (#426 — vision, priority) Status: BLOCKED — no evidence process connected to website ## Objective: Adoption — Example project demonstrating full lifecycle - [x] Bootstrap path unblocked (#688 — closed) -- [ ] Example project design and implementation (#697 — vision) +- [ ] Example project design and implementation (#697 — vision, priority) Status: BLOCKED — #697 needs architect decomposition ## Objective: Adoption — Architect lifecycle completeness @@ -93,14 +93,14 @@ Status: DONE - [x] Caddy subpath routing skeleton (#704 — closed) - [x] Chat container scaffold (#705 — closed) - [x] Chat sandbox hardening (#706 — closed) -- [ ] Claude identity isolation (#707 — in-progress) -- [ ] Forgejo OAuth gate (#708 — in-progress) -- [ ] Caddy Remote-User forwarding + validation (#709 — backlog) -- [ ] Conversation history persistence (#710 — backlog) -- [ ] Cost caps + rate limiting (#711 — backlog) -- [ ] Escalation tools (#712 — backlog) -- [ ] Per-project subdomain fallback (#713 — backlog) -Status: IN PROGRESS — 3/10 sub-issues closed, 2 in-progress, 5 backlog +- [x] Forgejo OAuth gate (#708 — closed) +- [x] Caddy Remote-User forwarding + validation (#709 — closed) +- [x] Cost caps + rate limiting (#711 — closed) +- [ ] Claude identity isolation (#707 — blocked, ci_exhausted) +- [ ] Conversation history persistence (#710 — in-progress) +- [ ] Escalation tools (#712 — backlog, priority) +- [ ] Per-project subdomain fallback (#713 — in-progress) +Status: IN PROGRESS — 6/10 sub-issues closed, 1 blocked (ci_exhausted), 2 in-progress, 1 backlog ## Objective: Ship (Fold 2) — Deploy profiles per artifact type - [ ] No deploy profiles defined