chore: planner run 5 (2026-04-11) #18

Closed
planner-bot wants to merge 4 commits from chore/planner-run5-2026-04-11 into main
2 changed files with 31 additions and 26 deletions
Showing only changes of commit 4d82a4020f - Show all commits

View file

@ -1,4 +1,4 @@
<!-- summarized-through-run: 4 --> <!-- summarized-through-run: 5 -->
# Planner Memory # Planner Memory
Last updated: 2026-04-11 Last updated: 2026-04-11
@ -6,27 +6,30 @@ Last updated: 2026-04-11
- Run 1 (2026-04-05): First planning run. Established prerequisite tree from VISION.md. - Run 1 (2026-04-05): First planning run. Established prerequisite tree from VISION.md.
- Run 2 (2026-04-08): Foundation milestone completed. Triaged 4 predictor predictions. Filed #425, #426. Focus shifted to Adoption. - Run 2 (2026-04-08): Foundation milestone completed. Triaged 4 predictor predictions. Filed #425, #426. Focus shifted to Adoption.
- Run 3 (2026-04-11): Infrastructure maturity work (#641-#652, #663, #669, #671, #682). Prerequisite tree updated with Foundation+ objective. - Run 3 (2026-04-11): Infrastructure maturity work (#641-#652, #663, #669, #671, #682). Prerequisite tree updated with Foundation+ objective.
- Run 4 (2026-04-11): Foundation+ DONE (#647 closed). Adoption architect DONE (#689, #690 closed). Ops repo migration DONE (#688 closed — vault/evidence/sprints dirs exist). Filed #697 (example project). 0 predictions to triage. - Run 4 (2026-04-11): Foundation+ DONE (#647 closed). Adoption architect DONE (#689, #690 closed). Ops repo migration DONE (#688 closed). Filed #697 (example project). 0 predictions to triage.
- Run 5 (2026-04-11): #693 (dev-poll deadlock) closed — dev pipeline reliability nearly DONE. #702 (journal hang on Qwen) new bug, in-progress. #665 (edge cold start) promoted to backlog. Priority added to #426, #697. 0 predictions to triage.
## Current constraint focus ## Current constraint focus
1. **Dev-poll deadlock** (#693) — in-progress bug, blocks dev agent reliability in same-container deployments. Being worked by dev-qwen. 1. **Website observability** (#426) — vision, priority. disinto.ai has no analytics. Blocks Adoption landing page AND Ship engagement measurement. Two downstream objectives. Longest-standing constraint.
2. **Website observability** (#426) — vision. disinto.ai has no analytics. Blocks Adoption landing page AND Ship engagement measurement. Two downstream objectives. 2. **Example project** (#697) — vision, priority. Needs architect decomposition. Key Adoption deliverable and onboarding asset.
3. **Example project** (#697) — vision. Now unblocked by #688. Needs architect decomposition. Key Adoption deliverable and onboarding asset. 3. **Edge cold-start crash** (#665) — backlog. Edge container clones from forgejo before forgejo is ready. Blocks clean bootstrap. Simple fix (retry/wait loop).
4. **Deploy profiles** — not started. Vision-level design needed. Blocks Ship milestone. 4. **Profile journal hang** (#702) — in-progress. Journal digestion hangs on local Qwen with many entries. Affects dev-agent reliability.
5. **Assumptions register** — not started. Blocks Ship milestone. 5. **Deploy profiles** — not started. Vision-level design needed. Blocks Ship milestone.
## Patterns observed ## Patterns observed
- Foundation milestone completed in ~10 days (2026-03-28 to 2026-04-08). Foundation+ completed in ~3 days (2026-04-08 to 2026-04-11). Infrastructure maturity accelerating. - Foundation completed in ~10 days, Foundation+ in ~3 days. Infrastructure maturity accelerating.
- Predictor-planner loop working: 7 predictions triaged across runs 2-3, all actioned. No new predictions in run 4. - Predictor-planner loop working: 7 predictions triaged across runs 2-3. No new predictions in runs 4-5. Either predictor interval is too infrequent or system is stable.
- Architect lifecycle now complete: #689 (close parent vision) and #690 (signature bug) both fixed. Architect can now decompose vision issues into sprints autonomously. - Architect lifecycle complete (#689, #690 fixed). Can autonomously decompose vision issues into sprints.
- Ops repo structural debt resolved: #688 closed, migrate_ops_repo() auto-triggers on startup. All canonical dirs present (vault/pending|approved|fired|rejected, evidence/*, sprints/). - Dev pipeline nearly reliable: #693 deadlock fixed. #702 (Qwen journal hang) is the remaining operational issue.
- No observables exist — all addressables (website, repo, skill, github org) lack measurement. This remains the fundamental gap between Adoption and Ship. - No observables exist — all addressables (website, repo, skill, github org) lack measurement. Fundamental gap between Adoption and Ship.
- Graph healthy: 207 nodes, 240 edges, no cycles, no bottlenecks. Orphans are benign (closed issues, unused formulas/labels). - Graph healthy: 206 nodes, 246 edges, no cycles, no bottlenecks. Orphans are benign.
- Massive fix velocity: 30+ issues closed 2026-04-10 to 2026-04-11 (infrastructure, credential, profile, entrypoint fixes).
## Strategic direction ## Strategic direction
- Foundation and Foundation+ both DONE. Adoption is the active milestone. - Foundation and Foundation+ both DONE. Adoption is the active milestone.
- Three Adoption objectives DONE (Forgejo+CI, architect lifecycle, bootstrap infrastructure). Three remain: landing page (#426), example project (#697), bootstrap verification. - Four Adoption objectives DONE (Forgejo+CI, architect lifecycle, bootstrap infrastructure, dev pipeline reliability). Three remain: landing page (#426), example project (#697), bootstrap cold-start (#665).
- #693 (dev-poll deadlock) is the only active bug — if resolved, dev pipeline is fully reliable. - #426 and #697 are both vision-level — architect should decompose them into sprint issues. Both now have priority label.
- #697 and #426 are both vision-level — architect should decompose them into sprint issues. - #665 is a simple bug now in backlog — should be picked up by next dev-agent run.
- Do NOT file Ship/Learn issues until Adoption objectives show progress. Predictor will check. - #702 is being actively worked — monitor but don't interfere.
- RESOURCES.md and portfolio.md are empty placeholders — low priority but should be populated as addressables/observables materialize. - Do NOT file Ship/Learn issues until Adoption objectives show progress.
- RESOURCES.md and portfolio.md remain empty placeholders — populate as addressables/observables materialize.

View file

@ -18,7 +18,7 @@ Status: DONE
## Objective: Foundation — Planner gap analysis against vision ## Objective: Foundation — Planner gap analysis against vision
- [x] Planner formula exists (run-planner.toml v4) - [x] Planner formula exists (run-planner.toml v4)
- [x] planner-run.sh cron wrapper exists - [x] planner-run.sh cron wrapper exists
- [x] Planning runs established (runs 14) - [x] Planning runs established (runs 15)
Status: DONE Status: DONE
## Objective: Foundation — Multi-project support ## Objective: Foundation — Multi-project support
@ -29,7 +29,7 @@ Status: DONE
## Objective: Foundation — Knowledge graph for structural defect detection ## Objective: Foundation — Knowledge graph for structural defect detection
- [x] networkx package installed in agents container (#220 — closed) - [x] networkx package installed in agents container (#220 — closed)
- [x] build-graph.py exists in lib/ - [x] build-graph.py exists in lib/
- [x] Graph report generating successfully (207 nodes, 240 edges as of 2026-04-11) - [x] Graph report generating successfully (206 nodes, 246 edges as of 2026-04-11)
Status: DONE Status: DONE
## Objective: Foundation — Predictor-planner adversarial feedback loop ## Objective: Foundation — Predictor-planner adversarial feedback loop
@ -57,8 +57,9 @@ Status: DONE
- [x] Prediction labels created during init (#225 — closed) - [x] Prediction labels created during init (#225 — closed)
- [x] Ops repo migration code merged (#425 — closed) - [x] Ops repo migration code merged (#425 — closed)
- [x] Ops repo migration auto-triggers on agent startup (#688 — closed) - [x] Ops repo migration auto-triggers on agent startup (#688 — closed)
- [ ] End-to-end bootstrap verification with example project (#697 — vision) - [ ] Edge container cold-start crash (#665 — backlog)
Status: READY — migration works, needs end-to-end verification - [ ] End-to-end bootstrap verification with example project (#697 — vision, priority)
Status: READY — migration works, #665 blocks clean cold-start, #697 needs architect decomposition
## Objective: Adoption — Built-in Forgejo + Woodpecker CI ## Objective: Adoption — Built-in Forgejo + Woodpecker CI
- [x] Docker compose with Forgejo + Woodpecker - [x] Docker compose with Forgejo + Woodpecker
@ -68,12 +69,12 @@ Status: DONE
## Objective: Adoption — Landing page communicating value proposition ## Objective: Adoption — Landing page communicating value proposition
- [x] Website addressable exists (disinto.ai) - [x] Website addressable exists (disinto.ai)
- [ ] Website observability — no engagement measurement (#426 — vision) - [ ] Website observability — no engagement measurement (#426 — vision, priority)
Status: BLOCKED — no evidence process connected to website Status: BLOCKED — no evidence process connected to website
## Objective: Adoption — Example project demonstrating full lifecycle ## Objective: Adoption — Example project demonstrating full lifecycle
- [x] Bootstrap path unblocked (#688 — closed) - [x] Bootstrap path unblocked (#688 — closed)
- [ ] Example project design and implementation (#697 — vision) - [ ] Example project design and implementation (#697 — vision, priority)
Status: BLOCKED — #697 needs architect decomposition Status: BLOCKED — #697 needs architect decomposition
## Objective: Adoption — Architect lifecycle completeness ## Objective: Adoption — Architect lifecycle completeness
@ -82,8 +83,9 @@ Status: BLOCKED — #697 needs architect decomposition
Status: DONE Status: DONE
## Objective: Adoption — Dev agent pipeline reliability ## Objective: Adoption — Dev agent pipeline reliability
- [ ] Dev-poll deadlock in same-container case (#693 — in-progress) - [x] Dev-poll deadlock in same-container case (#693 — closed)
Status: BLOCKED — #693 being worked by dev-qwen - [ ] Profile journal digestion hang on Qwen (#702 — in-progress)
Status: READY — #693 fixed, #702 being worked
## Objective: Ship (Fold 2) — Deploy profiles per artifact type ## Objective: Ship (Fold 2) — Deploy profiles per artifact type
- [ ] No deploy profiles defined - [ ] No deploy profiles defined