chore: planner run 2026-04-12 #19
15 changed files with 85 additions and 28 deletions
5
RESOURCES.md
Normal file
5
RESOURCES.md
Normal file
|
|
@ -0,0 +1,5 @@
|
||||||
|
# RESOURCES
|
||||||
|
|
||||||
|
## Overview
|
||||||
|
|
||||||
|
<!-- Add content here -->
|
||||||
0
evidence/engagement/.gitkeep
Normal file
0
evidence/engagement/.gitkeep
Normal file
0
evidence/evolution/.gitkeep
Normal file
0
evidence/evolution/.gitkeep
Normal file
0
evidence/holdout/.gitkeep
Normal file
0
evidence/holdout/.gitkeep
Normal file
0
evidence/red-team/.gitkeep
Normal file
0
evidence/red-team/.gitkeep
Normal file
0
evidence/user-test/.gitkeep
Normal file
0
evidence/user-test/.gitkeep
Normal file
0
knowledge/.gitkeep
Normal file
0
knowledge/.gitkeep
Normal file
|
|
@ -1,28 +1,32 @@
|
||||||
<!-- summarized-through-run: 2 -->
|
<!-- summarized-through-run: 4 -->
|
||||||
# Planner Memory
|
# Planner Memory
|
||||||
Last updated: 2026-04-08
|
Last updated: 2026-04-11
|
||||||
|
|
||||||
## Run history
|
## Run history
|
||||||
- Run 1 (2026-04-05): First planning run. Established prerequisite tree from VISION.md.
|
- Run 1 (2026-04-05): First planning run. Established prerequisite tree from VISION.md.
|
||||||
- Run 2 (2026-04-08): Foundation milestone completed. All 5 blockers resolved. Triaged 4 predictor predictions (all actioned). Filed #425 (ops repo migration) and #426 (website observability). Focus shifted to Adoption milestone.
|
- Run 2 (2026-04-08): Foundation milestone completed. Triaged 4 predictor predictions. Filed #425, #426. Focus shifted to Adoption.
|
||||||
|
- Run 3 (2026-04-11): Infrastructure maturity work (#641-#652, #663, #669, #671, #682). Prerequisite tree updated with Foundation+ objective.
|
||||||
|
- Run 4 (2026-04-11): Foundation+ DONE (#647 closed). Adoption architect DONE (#689, #690 closed). Ops repo migration DONE (#688 closed — vault/evidence/sprints dirs exist). Filed #697 (example project). 0 predictions to triage.
|
||||||
|
|
||||||
## Current constraint focus
|
## Current constraint focus
|
||||||
1. **Ops repo migration** (#425) — existing deployments missing evidence/, sprints/, portfolio.md, RESOURCES.md, vault subdirs. Blocks evidence collection for all agents. Priority+backlog.
|
1. **Dev-poll deadlock** (#693) — in-progress bug, blocks dev agent reliability in same-container deployments. Being worked by dev-qwen.
|
||||||
2. **Website observability** (#426) — disinto.ai has no analytics/measurement. Blocks Adoption landing page and Ship engagement measurement. Vision-level (design decisions needed).
|
2. **Website observability** (#426) — vision. disinto.ai has no analytics. Blocks Adoption landing page AND Ship engagement measurement. Two downstream objectives.
|
||||||
3. **Example project** — none exists. Blocked on bootstrap verification after #425.
|
3. **Example project** (#697) — vision. Now unblocked by #688. Needs architect decomposition. Key Adoption deliverable and onboarding asset.
|
||||||
4. **Deploy profiles** — not started. Vision-level design needed for per-artifact-type deployment.
|
4. **Deploy profiles** — not started. Vision-level design needed. Blocks Ship milestone.
|
||||||
5. **Assumptions register** — not started. Ship (Fold 2) prerequisite.
|
5. **Assumptions register** — not started. Blocks Ship milestone.
|
||||||
|
|
||||||
## Patterns observed
|
## Patterns observed
|
||||||
- Foundation milestone completed in ~10 days (2026-03-28 to 2026-04-08). High bug fix velocity once dev-agent pipeline was reliable.
|
- Foundation milestone completed in ~10 days (2026-03-28 to 2026-04-08). Foundation+ completed in ~3 days (2026-04-08 to 2026-04-11). Infrastructure maturity accelerating.
|
||||||
- Predictor-planner loop working: predictor filed 4 accurate predictions, planner actioned all 4. The adversarial feedback catches stale state and planner drift effectively.
|
- Predictor-planner loop working: 7 predictions triaged across runs 2-3, all actioned. No new predictions in run 4.
|
||||||
- Predictor correctly identified planner filing Fold 2/3 vision issues (#418, #419) while Foundation was incomplete — planner must verify milestone completion before advancing.
|
- Architect lifecycle now complete: #689 (close parent vision) and #690 (signature bug) both fixed. Architect can now decompose vision issues into sprints autonomously.
|
||||||
- Ops repo structural debt: setup_ops_repo() creates dirs for new repos but doesn't migrate existing ones. Pattern will recur with future schema changes.
|
- Ops repo structural debt resolved: #688 closed, migrate_ops_repo() auto-triggers on startup. All canonical dirs present (vault/pending|approved|fired|rejected, evidence/*, sprints/).
|
||||||
- No observables exist — all 4 addressables (website, repo, skill, github org) lack measurement. This is the fundamental gap between Adoption and Ship.
|
- No observables exist — all addressables (website, repo, skill, github org) lack measurement. This remains the fundamental gap between Adoption and Ship.
|
||||||
|
- Graph healthy: 207 nodes, 240 edges, no cycles, no bottlenecks. Orphans are benign (closed issues, unused formulas/labels).
|
||||||
|
|
||||||
## Strategic direction
|
## Strategic direction
|
||||||
- Foundation DONE. Adoption is now the active milestone.
|
- Foundation and Foundation+ both DONE. Adoption is the active milestone.
|
||||||
- #425 is the single blocking issue — once ops repo dirs exist, evidence collection unblocks and bootstrap is complete.
|
- Three Adoption objectives DONE (Forgejo+CI, architect lifecycle, bootstrap infrastructure). Three remain: landing page (#426), example project (#697), bootstrap verification.
|
||||||
- After #425: focus on example project (demonstrates full lifecycle) and website observability (#426).
|
- #693 (dev-poll deadlock) is the only active bug — if resolved, dev pipeline is fully reliable.
|
||||||
|
- #697 and #426 are both vision-level — architect should decompose them into sprint issues.
|
||||||
- Do NOT file Ship/Learn issues until Adoption objectives show progress. Predictor will check.
|
- Do NOT file Ship/Learn issues until Adoption objectives show progress. Predictor will check.
|
||||||
- Graph report is healthy: 165 nodes, 137 edges, no cycles, no bottlenecks. 7 orphans are benign (closed issues, unused formulas/labels).
|
- RESOURCES.md and portfolio.md are empty placeholders — low priority but should be populated as addressables/observables materialize.
|
||||||
|
|
|
||||||
5
portfolio.md
Normal file
5
portfolio.md
Normal file
|
|
@ -0,0 +1,5 @@
|
||||||
|
# Portfolio
|
||||||
|
|
||||||
|
## Overview
|
||||||
|
|
||||||
|
<!-- Add content here -->
|
||||||
|
|
@ -1,5 +1,5 @@
|
||||||
# Prerequisite Tree
|
# Prerequisite Tree
|
||||||
<!-- Last updated: 2026-04-08 -->
|
<!-- Last updated: 2026-04-12 -->
|
||||||
|
|
||||||
## Objective: Foundation — Core agent loop (dev → CI → review → merge)
|
## Objective: Foundation — Core agent loop (dev → CI → review → merge)
|
||||||
- [x] dev-agent picks up backlog issues (dev/dev-agent.sh exists)
|
- [x] dev-agent picks up backlog issues (dev/dev-agent.sh exists)
|
||||||
|
|
@ -18,7 +18,7 @@ Status: DONE
|
||||||
## Objective: Foundation — Planner gap analysis against vision
|
## Objective: Foundation — Planner gap analysis against vision
|
||||||
- [x] Planner formula exists (run-planner.toml v4)
|
- [x] Planner formula exists (run-planner.toml v4)
|
||||||
- [x] planner-run.sh cron wrapper exists
|
- [x] planner-run.sh cron wrapper exists
|
||||||
- [x] Planning runs established and maintaining prerequisite tree (run 1: 2026-04-05, run 2: 2026-04-08)
|
- [x] Planning runs established (runs 1–5)
|
||||||
Status: DONE
|
Status: DONE
|
||||||
|
|
||||||
## Objective: Foundation — Multi-project support
|
## Objective: Foundation — Multi-project support
|
||||||
|
|
@ -29,24 +29,36 @@ Status: DONE
|
||||||
## Objective: Foundation — Knowledge graph for structural defect detection
|
## Objective: Foundation — Knowledge graph for structural defect detection
|
||||||
- [x] networkx package installed in agents container (#220 — closed)
|
- [x] networkx package installed in agents container (#220 — closed)
|
||||||
- [x] build-graph.py exists in lib/
|
- [x] build-graph.py exists in lib/
|
||||||
- [x] Graph report generating successfully (165 nodes, 137 edges as of 2026-04-08)
|
- [x] Graph report generating successfully (215 nodes, 306 edges as of 2026-04-12)
|
||||||
Status: DONE
|
Status: DONE
|
||||||
|
|
||||||
## Objective: Foundation — Predictor-planner adversarial feedback loop
|
## Objective: Foundation — Predictor-planner adversarial feedback loop
|
||||||
- [x] Predictor formula exists (run-predictor.toml)
|
- [x] Predictor formula exists (run-predictor.toml)
|
||||||
- [x] Planner prediction triage step defined
|
- [x] Planner prediction triage step defined
|
||||||
- [x] Prediction workflow labels created on Forgejo (#225 — closed)
|
- [x] Prediction workflow labels created on Forgejo (#225 — closed)
|
||||||
- [x] Predictor filing predictions (4 predictions triaged in run 2)
|
- [x] Predictor filing predictions (7 predictions triaged across runs 2-3)
|
||||||
Status: DONE
|
Status: DONE
|
||||||
|
|
||||||
## --- FOUNDATION MILESTONE: DONE ---
|
## --- FOUNDATION MILESTONE: DONE ---
|
||||||
|
|
||||||
|
## Objective: Foundation+ — Infrastructure maturity
|
||||||
|
- [x] CLAUDE_CONFIG_DIR rollout (#641-#646 — all closed)
|
||||||
|
- [x] Credential handling cleanup (#669, #671 — closed)
|
||||||
|
- [x] Agent profile/journal fixes (#651, #652, #663 — closed)
|
||||||
|
- [x] Cron intervals configured (#682 — closed)
|
||||||
|
- [x] Remove external flock (#647 — closed)
|
||||||
|
Status: DONE
|
||||||
|
|
||||||
|
## --- FOUNDATION+ MILESTONE: DONE ---
|
||||||
|
|
||||||
## Objective: Adoption — One-command bootstrap (disinto init → disinto up)
|
## Objective: Adoption — One-command bootstrap (disinto init → disinto up)
|
||||||
- [x] disinto init re-run stability (#158 — closed)
|
- [x] disinto init re-run stability (#158 — closed)
|
||||||
- [x] disinto init repo creation API endpoint (#164 — closed)
|
- [x] disinto init repo creation API endpoint (#164 — closed)
|
||||||
- [x] Prediction labels created during init (#225 — closed)
|
- [x] Prediction labels created during init (#225 — closed)
|
||||||
- [ ] Ops repo migration for existing deployments (#425 — backlog+priority)
|
- [x] Ops repo migration code merged (#425 — closed)
|
||||||
Status: BLOCKED — #425 ops repo missing dirs on existing deployments
|
- [x] Ops repo migration auto-triggers on agent startup (#688 — closed)
|
||||||
|
- [ ] End-to-end bootstrap verification with example project (#697 — vision)
|
||||||
|
Status: READY — migration works, needs end-to-end verification
|
||||||
|
|
||||||
## Objective: Adoption — Built-in Forgejo + Woodpecker CI
|
## Objective: Adoption — Built-in Forgejo + Woodpecker CI
|
||||||
- [x] Docker compose with Forgejo + Woodpecker
|
- [x] Docker compose with Forgejo + Woodpecker
|
||||||
|
|
@ -60,9 +72,39 @@ Status: DONE
|
||||||
Status: BLOCKED — no evidence process connected to website
|
Status: BLOCKED — no evidence process connected to website
|
||||||
|
|
||||||
## Objective: Adoption — Example project demonstrating full lifecycle
|
## Objective: Adoption — Example project demonstrating full lifecycle
|
||||||
- [ ] No example project exists
|
- [x] Bootstrap path unblocked (#688 — closed)
|
||||||
- [ ] Requires verified bootstrap (#425)
|
- [ ] Example project design and implementation (#697 — vision)
|
||||||
Status: BLOCKED — depends on bootstrap completion and ops repo migration
|
Status: BLOCKED — #697 needs architect decomposition
|
||||||
|
|
||||||
|
## Objective: Adoption — Architect lifecycle completeness
|
||||||
|
- [x] Architect closes parent vision issues when sprint sub-issues complete (#689 — closed)
|
||||||
|
- [x] Architect-run.sh signature bug fixed (#690 — closed)
|
||||||
|
- [x] Architect-run.sh malformed URL fixed (#717 — closed)
|
||||||
|
- [x] Architect-run.sh empty pitch fixed (#716 — closed)
|
||||||
|
- [ ] Architect review detection: ignores formal APPROVED reviews (#718 — in-progress)
|
||||||
|
Status: READY — #718 being fixed by dev-bot, architect functional but has edge case
|
||||||
|
|
||||||
|
## Objective: Adoption — Dev agent pipeline reliability
|
||||||
|
- [x] Dev-poll deadlock in same-container case (#693 — closed)
|
||||||
|
- [x] WOODPECKER_REPO_ID agent container fix (#599 — closed)
|
||||||
|
- [x] Profile journal digestion hang (#702 — closed)
|
||||||
|
Status: DONE
|
||||||
|
|
||||||
|
## Objective: Adoption — Claude chat interface (#623 sprint)
|
||||||
|
- [x] Caddy subpath routing skeleton + Forgejo/Woodpecker host reconfig (#704 — closed)
|
||||||
|
- [ ] disinto-chat container scaffold, no auth (#705 — in-progress by dev-qwen)
|
||||||
|
- [ ] disinto-chat sandbox hardening (#706 — backlog)
|
||||||
|
- [ ] Claude identity isolation for disinto-chat (#707 — backlog)
|
||||||
|
- [ ] Forgejo OAuth gate for disinto-chat (#708 — backlog)
|
||||||
|
- [ ] Caddy Remote-User forwarding + chat-side validation (#709 — backlog)
|
||||||
|
- [ ] disinto-chat conversation history persistence (#710 — backlog)
|
||||||
|
- [ ] disinto-chat cost caps + rate limiting (#711 — backlog)
|
||||||
|
- [ ] disinto-chat escalation tools (#712 — backlog)
|
||||||
|
- [ ] Per-project subdomain fallback path, contingency (#713 — backlog)
|
||||||
|
Status: IN PROGRESS — 1/10 done, #705 active. Architect-decomposed sprint from #623.
|
||||||
|
|
||||||
|
## --- ADOPTION MILESTONE: IN PROGRESS ---
|
||||||
|
## 5 objectives DONE, 1 READY, 2 BLOCKED, 2 IN PROGRESS
|
||||||
|
|
||||||
## Objective: Ship (Fold 2) — Deploy profiles per artifact type
|
## Objective: Ship (Fold 2) — Deploy profiles per artifact type
|
||||||
- [ ] No deploy profiles defined
|
- [ ] No deploy profiles defined
|
||||||
|
|
@ -72,8 +114,9 @@ Status: BLOCKED — not started, needs design (vision-level)
|
||||||
## Objective: Ship (Fold 2) — Vault-gated fold transitions
|
## Objective: Ship (Fold 2) — Vault-gated fold transitions
|
||||||
- [x] Vault redesign complete (#73-#77 — all closed)
|
- [x] Vault redesign complete (#73-#77 — all closed)
|
||||||
- [x] Vault PR workflow documented (docs/VAULT.md)
|
- [x] Vault PR workflow documented (docs/VAULT.md)
|
||||||
- [ ] Vault directories complete in ops repo (#425 — approved/fired/rejected missing)
|
- [x] Vault directories complete in ops repo (#688 — closed)
|
||||||
Status: BLOCKED — #425 ops repo dirs needed for vault workflow
|
- [ ] Fold transition logic not implemented
|
||||||
|
Status: BLOCKED — needs design for fold gate mechanics
|
||||||
|
|
||||||
## Objective: Ship (Fold 2) — Engagement measurement baked into deploy pipelines
|
## Objective: Ship (Fold 2) — Engagement measurement baked into deploy pipelines
|
||||||
- [ ] No engagement measurement exists
|
- [ ] No engagement measurement exists
|
||||||
|
|
|
||||||
0
sprints/.gitkeep
Normal file
0
sprints/.gitkeep
Normal file
0
vault/approved/.gitkeep
Normal file
0
vault/approved/.gitkeep
Normal file
0
vault/fired/.gitkeep
Normal file
0
vault/fired/.gitkeep
Normal file
0
vault/pending/.gitkeep
Normal file
0
vault/pending/.gitkeep
Normal file
0
vault/rejected/.gitkeep
Normal file
0
vault/rejected/.gitkeep
Normal file
Loading…
Add table
Add a link
Reference in a new issue