# Prerequisite Tree ## Objective: Foundation — Core agent loop (dev → CI → review → merge) - [x] dev-agent picks up backlog issues (dev/dev-agent.sh exists) - [x] review-agent reviews PRs (review/review-pr.sh exists) - [x] CI integration with Woodpecker (lib/ci-helpers.sh exists) - [x] Stale in-progress recovery (#224 — closed) - [x] Agent race condition fix (#160 — closed) - [x] Dispatcher grep Alpine fix (#150 — closed) Status: DONE ## Objective: Foundation — Supervisor health monitoring - [x] supervisor-run.sh exists and runs via cron - [x] preflight.sh collects health data Status: DONE ## Objective: Foundation — Planner gap analysis against vision - [x] Planner formula exists (run-planner.toml v4) - [x] planner-run.sh cron wrapper exists - [x] Planning runs established (run 1: 2026-04-05, run 2: 2026-04-08, run 3: 2026-04-11) Status: DONE ## Objective: Foundation — Multi-project support - [x] Per-project TOML config (projects/*.toml) - [x] load-project.sh helper Status: DONE ## Objective: Foundation — Knowledge graph for structural defect detection - [x] networkx package installed in agents container (#220 — closed) - [x] build-graph.py exists in lib/ - [x] Graph report generating successfully (208 nodes, 245 edges as of 2026-04-11) Status: DONE ## Objective: Foundation — Predictor-planner adversarial feedback loop - [x] Predictor formula exists (run-predictor.toml) - [x] Planner prediction triage step defined - [x] Prediction workflow labels created on Forgejo (#225 — closed) - [x] Predictor filing predictions (7 predictions triaged across runs 2-3) Status: DONE ## --- FOUNDATION MILESTONE: DONE --- ## Objective: Foundation+ — Infrastructure maturity - [x] CLAUDE_CONFIG_DIR rollout (#641-#646 — all closed) - [x] Credential handling cleanup (#669, #671 — closed) - [x] Agent profile/journal fixes (#651, #652, #663 — closed) - [x] Cron intervals configured (#682 — closed) - [ ] Remove external flock once CLAUDE_CONFIG_DIR verified (#647 — vision, now READY) Status: READY — #647 is actionable now that CLAUDE_CONFIG_DIR is deployed ## Objective: Adoption — One-command bootstrap (disinto init → disinto up) - [x] disinto init re-run stability (#158 — closed) - [x] disinto init repo creation API endpoint (#164 — closed) - [x] Prediction labels created during init (#225 — closed) - [x] Ops repo migration code merged (#425 — closed) - [ ] Ops repo migration auto-triggers on agent startup (#688 — backlog+priority) Status: BLOCKED — #688 ensure_ops_repo doesn't call migrate_ops_repo; live env still missing dirs ## Objective: Adoption — Built-in Forgejo + Woodpecker CI - [x] Docker compose with Forgejo + Woodpecker - [x] Woodpecker OAuth2 redirect URI fix (#172 — closed) - [x] WOODPECKER_HOST override fix (#178 — closed) Status: DONE ## Objective: Adoption — Landing page communicating value proposition - [x] Website addressable exists (disinto.ai) - [ ] Website observability — no engagement measurement (#426 — vision) Status: BLOCKED — no evidence process connected to website ## Objective: Adoption — Example project demonstrating full lifecycle - [ ] No example project exists - [ ] Requires verified bootstrap (#688) Status: BLOCKED — depends on bootstrap completion and ops repo migration ## Objective: Adoption — Architect lifecycle completeness - [ ] Architect closes parent vision issues when sprint sub-issues complete (#689 — backlog) Status: BLOCKED — #689 not yet implemented ## Objective: Ship (Fold 2) — Deploy profiles per artifact type - [ ] No deploy profiles defined - [x] CI pipeline working (Woodpecker OAuth fixed) Status: BLOCKED — not started, needs design (vision-level) ## Objective: Ship (Fold 2) — Vault-gated fold transitions - [x] Vault redesign complete (#73-#77 — all closed) - [x] Vault PR workflow documented (docs/VAULT.md) - [ ] Vault directories complete in ops repo (#688 — approved/fired/rejected missing) Status: BLOCKED — #688 ops repo dirs needed for vault workflow ## Objective: Ship (Fold 2) — Engagement measurement baked into deploy pipelines - [ ] No engagement measurement exists - [ ] No observables yet (AGENTS.md confirms) Status: BLOCKED — depends on deploy profiles + website observability (#426) ## Objective: Ship (Fold 2) — Rent-a-human for gated channels - [x] run-rent-a-human formula exists - [ ] Not yet exercised in production Status: READY ## Objective: Ship (Fold 2) — Assumptions register - [ ] No assumptions register exists Status: BLOCKED — not started ## Objective: Learn (Fold 3) — Observable-driven planning - [ ] No observables exist yet Status: BLOCKED — depends on Ship milestone (engagement measurement) ## Objective: Learn (Fold 3) — Predictor challenges assumptions against signals - [ ] Requires observables + assumptions register Status: BLOCKED — depends on Ship milestone ## Objective: Learn (Fold 3) — Audience variation + signal detection - [ ] Requires observables Status: BLOCKED — depends on Ship milestone