# Planner Memory Last updated: 2026-04-12 ## Run history - Run 1 (2026-04-05): First planning run. Established prerequisite tree from VISION.md. - Run 2 (2026-04-08): Foundation milestone completed. Triaged 4 predictor predictions. Filed #425, #426. - Run 3 (2026-04-11): Infrastructure maturity work (#641-#652, #663, #669, #671, #682). - Run 4 (2026-04-11): Foundation+ DONE. Adoption architect DONE (#689, #690). Ops migration DONE (#688). Filed #697. - Run 5 (2026-04-12): Dev pipeline reliability DONE (#693, #702 closed). Chat 8/10 (#710, #713 closed). Found architect false-completion bug → filed #735. 0 predictions. ## Current constraint focus 1. **Architect false-completion bug** (#735) — backlog, priority. `get_vision_subissues()` Method 2 matches unrelated sub-issues, spams false completion comments on #426/#697. Blocks reliable architect lifecycle and vision issue decomposition. 2. **Website observability** (#426) — vision, priority. disinto.ai has no analytics. Blocks Adoption landing page AND Ship engagement measurement. Two downstream objectives. 3. **Example project** (#697) — vision, priority. Needs architect decomposition. Key Adoption deliverable. 4. **Chat ci_exhausted** (#707, #712) — both blocked, ci_exhausted. #712 has stale PR #733. These are the last 2 of 10 sub-issues for #623. 5. **Deploy profiles** — not started. Vision-level. Blocks Ship milestone. ## Patterns observed - Foundation completed in ~10 days, Foundation+ in ~3 days, dev pipeline reliability in ~1 day. Execution velocity increasing. - Chat assistant (#623) rapid progress: 6/10 → 8/10 sub-issues in one day. Final 2 are ci_exhausted — CI reliability is now the bottleneck, not implementation. - Architect lifecycle has a sub-issue matching bug (#735) — Method 2 in get_vision_subissues() creates false positives from unrelated ops repo PRs. This may be preventing architect from properly decomposing #426 and #697. - No predictor activity (0 predictions in runs 4-5). Either predictor is idle or all patterns are accounted for. - No observables exist — all addressables still lack measurement. Fundamental gap unchanged. - Graph healthy: 201 nodes, 266 edges, no cycles, no bottlenecks. ## Strategic direction - Adoption is the active milestone. 5 of 8 Adoption objectives DONE. - **Critical path**: #735 (architect bug) → architect decomposes #426 and #697 → Adoption objectives unblock. - Chat (#623) is 80% done. Remaining 2 issues are ci_exhausted — may resolve on retry or need investigation. - Do NOT file Ship/Learn issues until Adoption objectives show progress. - RESOURCES.md and portfolio.md remain empty — populate when addressables materialize.