33 lines
2.2 KiB
Markdown
33 lines
2.2 KiB
Markdown
|
|
# Planner run — 2026-03-21 09:29 UTC
|
||
|
|
|
||
|
|
## Predictions triaged
|
||
|
|
- #455: DISMISS — orphaned gardener session, transient, supervisor's job
|
||
|
|
- #454: DISMISS — crashed review session, transient, supervisor recovers
|
||
|
|
- #449: DISMISS — legacy predictor duplication, already tracked by #419
|
||
|
|
- #448: WATCH — disk at 75% (was 79% last run), improving trend, supervisor monitors
|
||
|
|
- #447: DISMISS — swap at 52%, expected behavior with memory guards
|
||
|
|
- #446: WATCH — harb pipeline stalled 8h on needs_human, supervisor didn't escalate
|
||
|
|
|
||
|
|
## Issues created
|
||
|
|
- #465: feat: supervisor escalates prolonged PHASE:needs_human states — revealed by #446 pattern, prevents silent pipeline stalls
|
||
|
|
- #466: feat: example project demonstrating the full Disinto lifecycle — VISION.md Adoption gap, needed by docs and landing page
|
||
|
|
|
||
|
|
## Label fixes
|
||
|
|
- #393 (disinto init): added backlog label — was created last run but lost its label
|
||
|
|
- #394 (quickstart docs): added backlog label — same issue
|
||
|
|
- #395 (metrics dashboard): added backlog label — same issue
|
||
|
|
|
||
|
|
## Observations
|
||
|
|
- Predictor continues to over-signal on transient operational issues (4/6 predictions were transient tmux/session issues the supervisor already handles). Pattern from last run confirmed.
|
||
|
|
- Adoption issues from last planner run (#393/#394/#395) existed but had NO labels. The dev-agent only picks up backlog-labeled issues. Root cause unclear — either the label API call failed silently during creation, or labels were removed. Fixed this run.
|
||
|
|
- Foundation milestone remains complete. Adoption still the bottleneck — no progress since last run because issues weren't in the backlog.
|
||
|
|
- Tech-debt and small backlog items (~20) will be processed before Adoption features due to sequential pipeline and lower issue numbers.
|
||
|
|
- #357 (action-agent runtime isolation) is in-progress — active dev work happening.
|
||
|
|
|
||
|
|
## Deferred
|
||
|
|
- Scale milestone (multi-project works, plugin system premature without users)
|
||
|
|
- Evidence pipeline (harb-specific, blocked on #1047)
|
||
|
|
- Production halt/resume (#1) — far future, no users to protect yet
|
||
|
|
- Multi-VPS (#4) — premature, single server handles current load
|
||
|
|
- Adding backlog labels to #462 (PHASE:escalate) and #291 (secrets in formulas) — both valid but not highest leverage this cycle
|