39 lines
2.6 KiB
Markdown
39 lines
2.6 KiB
Markdown
|
|
# Planner run — 2026-03-22 07:02 UTC
|
||
|
|
|
||
|
|
## Predictions triaged
|
||
|
|
- #528: DISMISS — missing backlog label on #466. Fixed directly by adding the label. Recurring label-loss pattern (4/4 planner-created issues affected). Closed.
|
||
|
|
- #529: WATCH — swap at 57%, up from 52% (#447). Available RAM (4385MB) still above 2000MB threshold. Monitoring upward trend.
|
||
|
|
|
||
|
|
## Prerequisite tree updates
|
||
|
|
- Resolved: #393, #394, #395, #510, #504, #516, #514 all closed since last run
|
||
|
|
- Objectives completed: 5 moved to DONE (init, docs, dashboard, escalation, vault)
|
||
|
|
- Objectives ready: #466 (example project), #534 (landing page) — both in backlog
|
||
|
|
|
||
|
|
## Top 3 constraints
|
||
|
|
1. #466 (example project) — blocks Adoption completion → delays Scale — issue already in backlog
|
||
|
|
2. #534 (landing page value proposition) — blocks Growth goals visibility — issue filed this run
|
||
|
|
3. #535 (label-loss on planner-created issues) — cross-cutting reliability — issue filed this run
|
||
|
|
|
||
|
|
## Issues created
|
||
|
|
- #534: feat: landing page communicates value proposition clearly — Adoption milestone gap, Growth goals
|
||
|
|
- #535: fix: planner-created issues lose backlog labels on creation — 4/4 failure rate, delays pipeline activation
|
||
|
|
|
||
|
|
## Label fixes
|
||
|
|
- #466: added backlog label — confirmed prediction #528 was correct, recurring pattern
|
||
|
|
|
||
|
|
## Observations
|
||
|
|
- Explosive progress: ~50 issues closed between 2026-03-20 and 2026-03-22. Foundation and most of Adoption now complete.
|
||
|
|
- Adoption milestone nearly done: only #466 (example project) and #534 (landing page) remain. Both are READY with no blocking prerequisites.
|
||
|
|
- Tech-debt queue (9 items: #93, #110, #179, #310, #311, #330, #429, #433, #435) has lower issue numbers than #466, so sequential pipeline will process them first.
|
||
|
|
- #531 (dev-poll direct merges) is in-progress — improves pipeline throughput for approved PRs.
|
||
|
|
- Vault infrastructure deployed but empty (no pending/approved/fired items). Procurement gate available when Scale needs resources.
|
||
|
|
- Label-loss pattern confirmed as persistent: 4/4 planner-created issues lost backlog labels. Filed #535 to investigate and fix.
|
||
|
|
- Predictor signal quality improving: 2 predictions this run (vs 6 last run), both actionable.
|
||
|
|
- Scale milestone remains premature — no users yet. Plugin system, community formulas, hosted option all deferred.
|
||
|
|
|
||
|
|
## Deferred (in tree, not filed)
|
||
|
|
- Scale: plugin system, community formulas, hosted option — premature without users
|
||
|
|
- Vision items: #1 (halt/resume), #2 (self-tuning), #4 (multi-VPS) — far future
|
||
|
|
- Prediction #448 (disk 75%): still in prediction/backlog, trend was improving
|
||
|
|
- Prediction #446 (harb stall): supervisor escalation (#465/#510) now in place, should prevent recurrence
|