diff --git a/planner/journal/2026-03-22.md b/planner/journal/2026-03-22.md new file mode 100644 index 0000000..a943ade --- /dev/null +++ b/planner/journal/2026-03-22.md @@ -0,0 +1,38 @@ +# Planner run — 2026-03-22 07:02 UTC + +## Predictions triaged +- #528: DISMISS — missing backlog label on #466. Fixed directly by adding the label. Recurring label-loss pattern (4/4 planner-created issues affected). Closed. +- #529: WATCH — swap at 57%, up from 52% (#447). Available RAM (4385MB) still above 2000MB threshold. Monitoring upward trend. + +## Prerequisite tree updates +- Resolved: #393, #394, #395, #510, #504, #516, #514 all closed since last run +- Objectives completed: 5 moved to DONE (init, docs, dashboard, escalation, vault) +- Objectives ready: #466 (example project), #534 (landing page) — both in backlog + +## Top 3 constraints +1. #466 (example project) — blocks Adoption completion → delays Scale — issue already in backlog +2. #534 (landing page value proposition) — blocks Growth goals visibility — issue filed this run +3. #535 (label-loss on planner-created issues) — cross-cutting reliability — issue filed this run + +## Issues created +- #534: feat: landing page communicates value proposition clearly — Adoption milestone gap, Growth goals +- #535: fix: planner-created issues lose backlog labels on creation — 4/4 failure rate, delays pipeline activation + +## Label fixes +- #466: added backlog label — confirmed prediction #528 was correct, recurring pattern + +## Observations +- Explosive progress: ~50 issues closed between 2026-03-20 and 2026-03-22. Foundation and most of Adoption now complete. +- Adoption milestone nearly done: only #466 (example project) and #534 (landing page) remain. Both are READY with no blocking prerequisites. +- Tech-debt queue (9 items: #93, #110, #179, #310, #311, #330, #429, #433, #435) has lower issue numbers than #466, so sequential pipeline will process them first. +- #531 (dev-poll direct merges) is in-progress — improves pipeline throughput for approved PRs. +- Vault infrastructure deployed but empty (no pending/approved/fired items). Procurement gate available when Scale needs resources. +- Label-loss pattern confirmed as persistent: 4/4 planner-created issues lost backlog labels. Filed #535 to investigate and fix. +- Predictor signal quality improving: 2 predictions this run (vs 6 last run), both actionable. +- Scale milestone remains premature — no users yet. Plugin system, community formulas, hosted option all deferred. + +## Deferred (in tree, not filed) +- Scale: plugin system, community formulas, hosted option — premature without users +- Vision items: #1 (halt/resume), #2 (self-tuning), #4 (multi-VPS) — far future +- Prediction #448 (disk 75%): still in prediction/backlog, trend was improving +- Prediction #446 (harb stall): supervisor escalation (#465/#510) now in place, should prevent recurrence diff --git a/planner/prerequisite-tree.md b/planner/prerequisite-tree.md index d959455..2122acd 100644 --- a/planner/prerequisite-tree.md +++ b/planner/prerequisite-tree.md @@ -1,37 +1,38 @@ # Prerequisite Tree - + ## Objective: One-command bootstrap — `disinto init` (#393) - [x] Core agent loop stable (Foundation) - [x] Multi-project support (Foundation) - [x] Guard allows formula agents in worktrees (#487) -- [ ] Bundled dust cleanup — set-euo-pipefail (#516) -- [ ] Agent-session.sh pre-register worktree trust (#514) -Status: BLOCKED — 2 prerequisites unresolved +- [x] Bundled dust cleanup — set-euo-pipefail (#516) +- [x] Agent-session.sh pre-register worktree trust (#514) +Status: DONE — #393 closed ## Objective: Documentation site with quickstart (#394) -- [ ] disinto init working (#393) -Status: BLOCKED — prerequisite of prerequisite unresolved +- [x] disinto init working (#393) +Status: DONE — #394 closed ## Objective: Metrics dashboard (#395) -- [ ] disinto init working (#393) -- [ ] Supervisor formula stable -Status: BLOCKED — prerequisite of prerequisite unresolved +- [x] disinto init working (#393) +- [x] Supervisor formula stable +Status: DONE — #395 closed ## Objective: Example project demonstrating full lifecycle (#466) -- [ ] disinto init working (#393) -Status: BLOCKED — prerequisite of prerequisite unresolved +- [x] disinto init working (#393) +Status: READY — prerequisite resolved, issue in backlog -## Objective: Landing page communicating value proposition -- [ ] disinto init working (#393) -- [ ] Documentation site live (#394) -Status: BLOCKED — prerequisite chain unresolved +## Objective: Landing page communicating value proposition (#534) +- [x] disinto init working (#393) +- [x] Documentation site live (#394) +- [ ] Planner-created issues retain labels reliably (#535) +Status: READY — prerequisites resolved, issue filed ## Objective: Unified escalation path (#510) - [x] PHASE:escalate replaces PHASE:needs_human (supersedes #465) -Status: IN PROGRESS +Status: DONE — #510 closed ## Objective: Vault as procurement gate + RESOURCES.md inventory (#504) - [x] RESOURCES.md exists -- [ ] Vault poll operational -Status: BLOCKED — 1 prerequisite unresolved +- [x] Vault poll scripts deployed (vault-poll.sh) +Status: DONE — #504 closed