From b7976fcce4381cfee6d62c2905d713603fe73981 Mon Sep 17 00:00:00 2001 From: openhands Date: Wed, 25 Mar 2026 07:22:42 +0000 Subject: [PATCH] chore: planner run 2026-03-25 - Triaged 6 predictions: 2 promoted (#663, #664), 1 watched, 3 dismissed - Updated prerequisite tree: #568 DONE, #466 ESCALATED, added operational reliability objective - Filed 3 issues: #663 (guard logging), #664 (stale phase cleanup), #668 (init smoke test) - Prioritized top 5 constraints: #466, #661, #663, #664, #668 --- planner/journal/2026-03-25.md | 53 +++++++++++++++++++++++++++++++++++ planner/prerequisite-tree.md | 20 +++++++++---- 2 files changed, 68 insertions(+), 5 deletions(-) create mode 100644 planner/journal/2026-03-25.md diff --git a/planner/journal/2026-03-25.md b/planner/journal/2026-03-25.md new file mode 100644 index 0000000..0df3e09 --- /dev/null +++ b/planner/journal/2026-03-25.md @@ -0,0 +1,53 @@ +# Planner run — 2026-03-25 07:15 UTC + +## Predictions triaged +- #656: DISMISS — planning deadlock is resolved by this run; tree staleness corrected +- #655: PROMOTE_BACKLOG → #663 — check_active guard should log when skipping +- #644: WATCH — disk P1 reactive cleanup works; not urgent enough for backlog slot +- #643: PROMOTE_BACKLOG → #664 — supervisor should clean stale phase files for closed issues +- #642: DISMISS — HTTP 401 likely caused by #653 (wrong remote), now fixed +- #640: DISMISS — all 5 bootstrap failures (#634-638) closed; remaining fixes in pipeline + +## Prerequisite tree updates +- Resolved: #568 (merge guard) moved from BLOCKED to DONE — was closed but tree was stale +- Resolved: bootstrap hardening issues #634-638, #652, #653, #658 all closed +- Discovered: #660 (Forgejo reachability) and #661 (Woodpecker CI wiring) as remaining init prerequisites +- Added: new objective "Factory operational reliability" with #663 and #664 +- Added: #668 (end-to-end init smoke test) as init prerequisite +- Status change: #466 marked ESCALATED (bounced + gardener escalation, awaiting human decision) + +## Top 5 constraints +1. #466 — example project — blocks Adoption completion — ESCALATED, awaiting human decision +2. #661 — Woodpecker CI wiring — blocks init completeness — in backlog with priority +3. #668 — init smoke test — blocks init quality assurance — filed this run +4. #663 — guard logging — prevents invisible agent dropouts — filed this run (from #655) +5. #664 — stale phase cleanup — reduces supervisor signal noise — filed this run (from #643) + +## Stuck issues detected +- #466: BOUNCED (1x, "too large for single session") + ESCALATED (gardener: "needs human decision on approach") — added comment noting escalation seen, suggested option (b) local demo may be viable + +## Issues created +- #663: fix: check_active guard should log to stderr when skipping (from prediction #655) +- #664: fix: supervisor should clean up stale PHASE:escalate files (from prediction #643) +- #668: feat: end-to-end disinto init smoke test in CI (new constraint — init quality) + +## Priority label changes +- Added priority: #661, #663, #664, #668 (top constraints) +- Kept priority: #466 (still #1 constraint, though escalated) +- No priority removed (only #466 had it previously) + +## Observations +- Massive progress since last run (2026-03-23): ~30 issues closed in 48h. Bootstrap hardening wave (#634-638, #652, #653, #658) completed. Full stack containerized (#618, #619). +- Planner missed 2026-03-24 run due to active-state guard deploy gap (#655). State files created 21h after guard merged. No visible signal of the missed run. +- Factory nearly idle: 1 in-progress (#660), 1 backlog (#661), plus 3 newly filed. After current pipeline clears, #466 is the only Adoption item left. +- Adoption milestone 4/5 complete. #466 is stuck on human decision (external vs local demo). The containerized stack work makes option (b) viable — suggested in comment. +- #568 (merge guard) was marked BLOCKED in tree but actually closed — 2-day stale tree from missed planner run. +- Predictor signal quality: 6 predictions, all substantive. 2 promoted, 1 watched, 3 dismissed. Better signal-to-noise than earlier runs. +- RESOURCES.md unchanged. Vault empty (no procurement requests). + +## Deferred (in tree, not filed) +- Scale: plugin system, community formulas, hosted option — premature without users +- Vision items: #1 (halt/resume), #2 (self-tuning), #4 (multi-VPS) — far future +- Prediction #644 (disk P1): watching, reactive cleanup works +- Prediction #580 (Caddy CVEs): still in prediction/backlog, static site mitigates +- Prediction #529 (swap 57%): stable, not trending worse diff --git a/planner/prerequisite-tree.md b/planner/prerequisite-tree.md index f41b718..5b81e6f 100644 --- a/planner/prerequisite-tree.md +++ b/planner/prerequisite-tree.md @@ -1,5 +1,5 @@ # Prerequisite Tree - + ## Objective: One-command bootstrap — `disinto init` (#393) - [x] Core agent loop stable (Foundation) @@ -7,7 +7,11 @@ - [x] Guard allows formula agents in worktrees (#487) - [x] Bundled dust cleanup — set-euo-pipefail (#516) - [x] Agent-session.sh pre-register worktree trust (#514) -Status: DONE — #393 closed +- [x] Bootstrap hardening — Forgejo INSTALL_LOCK (#634), su-exec (#635), admin user (#636), DNS (#637), crontab (#638), auth (#652), remote target (#653), token creation (#658) +- [ ] Agents container reaches Forgejo — env.sh override (#660) — in-progress +- [ ] Woodpecker CI wiring during init (#661) — in backlog +- [ ] End-to-end init smoke test (#668) — in backlog +Status: DONE (code merged) — hardening fixes landing, smoke test pending ## Objective: Documentation site with quickstart (#394) - [x] disinto init working (#393) @@ -20,7 +24,8 @@ Status: DONE — #395 closed ## Objective: Example project demonstrating full lifecycle (#466) - [x] disinto init working (#393) -Status: READY — issue in backlog with priority +- [ ] Human decision on implementation approach (external repo vs local demo) ⚠ escalated — awaiting human decision +Status: BLOCKED — bounced by dev-agent (too large), escalated by gardener (2026-03-23), awaiting human decision ## Objective: Landing page communicating value proposition (#534) - [x] disinto init working (#393) @@ -29,8 +34,8 @@ Status: READY — issue in backlog with priority Status: DONE — #534 closed ## Objective: Autonomous PR merge pipeline (#568) -- [ ] PreToolUse guard allows merge API calls from phase-handler (#568) -Status: BLOCKED — every PR merge escalates; backlog+priority labeled +- [x] PreToolUse guard allows merge API calls from phase-handler (#568) +Status: DONE — #568 closed ## Objective: Unified escalation path (#510) - [x] PHASE:escalate replaces PHASE:needs_human (supersedes #465) @@ -40,3 +45,8 @@ Status: DONE — #510 closed - [x] RESOURCES.md exists - [x] Vault poll scripts deployed (vault-poll.sh) Status: DONE — #504 closed + +## Objective: Factory operational reliability +- [ ] check_active guard logs when skipping (#663) — in backlog +- [ ] Supervisor cleans stale PHASE:escalate files (#664) — in backlog +Status: BLOCKED — 2 prerequisites unresolved