# Planner run — 2026-03-25 07:15 UTC ## Predictions triaged - #656: DISMISS — planning deadlock is resolved by this run; tree staleness corrected - #655: PROMOTE_BACKLOG → #663 — check_active guard should log when skipping - #644: WATCH — disk P1 reactive cleanup works; not urgent enough for backlog slot - #643: PROMOTE_BACKLOG → #664 — supervisor should clean stale phase files for closed issues - #642: DISMISS — HTTP 401 likely caused by #653 (wrong remote), now fixed - #640: DISMISS — all 5 bootstrap failures (#634-638) closed; remaining fixes in pipeline ## Prerequisite tree updates - Resolved: #568 (merge guard) moved from BLOCKED to DONE — was closed but tree was stale - Resolved: bootstrap hardening issues #634-638, #652, #653, #658 all closed - Discovered: #660 (Forgejo reachability) and #661 (Woodpecker CI wiring) as remaining init prerequisites - Added: new objective "Factory operational reliability" with #663 and #664 - Added: #668 (end-to-end init smoke test) as init prerequisite - Status change: #466 marked ESCALATED (bounced + gardener escalation, awaiting human decision) ## Top 5 constraints 1. #466 — example project — blocks Adoption completion — ESCALATED, awaiting human decision 2. #661 — Woodpecker CI wiring — blocks init completeness — in backlog with priority 3. #668 — init smoke test — blocks init quality assurance — filed this run 4. #663 — guard logging — prevents invisible agent dropouts — filed this run (from #655) 5. #664 — stale phase cleanup — reduces supervisor signal noise — filed this run (from #643) ## Stuck issues detected - #466: BOUNCED (1x, "too large for single session") + ESCALATED (gardener: "needs human decision on approach") — added comment noting escalation seen, suggested option (b) local demo may be viable ## Issues created - #663: fix: check_active guard should log to stderr when skipping (from prediction #655) - #664: fix: supervisor should clean up stale PHASE:escalate files (from prediction #643) - #668: feat: end-to-end disinto init smoke test in CI (new constraint — init quality) ## Priority label changes - Added priority: #661, #663, #664, #668 (top constraints) - Kept priority: #466 (still #1 constraint, though escalated) - No priority removed (only #466 had it previously) ## Observations - Massive progress since last run (2026-03-23): ~30 issues closed in 48h. Bootstrap hardening wave (#634-638, #652, #653, #658) completed. Full stack containerized (#618, #619). - Planner missed 2026-03-24 run due to active-state guard deploy gap (#655). State files created 21h after guard merged. No visible signal of the missed run. - Factory nearly idle: 1 in-progress (#660), 1 backlog (#661), plus 3 newly filed. After current pipeline clears, #466 is the only Adoption item left. - Adoption milestone 4/5 complete. #466 is stuck on human decision (external vs local demo). The containerized stack work makes option (b) viable — suggested in comment. - #568 (merge guard) was marked BLOCKED in tree but actually closed — 2-day stale tree from missed planner run. - Predictor signal quality: 6 predictions, all substantive. 2 promoted, 1 watched, 3 dismissed. Better signal-to-noise than earlier runs. - RESOURCES.md unchanged. Vault empty (no procurement requests). ## Deferred (in tree, not filed) - Scale: plugin system, community formulas, hosted option — premature without users - Vision items: #1 (halt/resume), #2 (self-tuning), #4 (multi-VPS) — far future - Prediction #644 (disk P1): watching, reactive cleanup works - Prediction #580 (Caddy CVEs): still in prediction/backlog, static site mitigates - Prediction #529 (swap 57%): stable, not trending worse