# Planner run — 2026-03-26 07:15 UTC ## Predictions triaged - #644: DISMISS — disk P1 handled by supervisor reactive cleanup, no persistent issue - #580: DISMISS — Caddy CVEs don't apply to static site (no FastCGI/PHP) - #529: DISMISS — swap stable at 57%, supervisor monitors, not trending worse - #446: DISMISS — root cause fixed by #465/#510 escalation path improvements All 4 were prediction/backlog → migrated to prediction/dismissed per #686 policy. Created prediction/dismissed label (was missing). ## Prerequisite tree updates - Resolved: #660 (Forgejo reachability), #661 (Woodpecker CI wiring), #668 (init smoke test), #663 (guard logging), #664 (stale phase cleanup) — all closed - Objectives completed: bootstrap (#393) now FULLY DONE (all prereqs resolved), factory operational reliability DONE - New objectives added: exec agent (#699) DONE, rent-a-human (#679) DONE, skill package distribution (#710-#712), observable addressables (#718) - Discovered: #710-#715 skill package initiative (created since last run), with #714/#715 as duplicates of #710/#711 ## Top 5 constraints 1. #466 — example project — blocks Adoption completion — ESCALATED 3 days, no human response 2. #710 — skill package creation — enables distribution — in backlog with priority 3. #718 — observable addressables — Ship milestone bridge — filed this run 4. #714/#715 — duplicate issues — pending gardener cleanup 5. prediction/backlog label — should be deleted per #686 — needs admin action ## Stuck issues detected - #466: ESCALATED (since 2026-03-23, 3 days) — no human response. Dev-agent bounced as too large, gardener escalated for approach decision. Not re-promoting — already has priority label. ## Issues created - #718: feat: observable addressables — engagement measurement for deployed artifacts — Ship milestone, Fold 2→3 bridge ## Priority label changes - Added priority: #710 (next ready pipeline work) - Kept priority: #466 (still #1 constraint, escalated) - No priority removed ## Label changes - #710, #711, #712, #713: added backlog (were unlabeled, invisible to pipeline) - #644, #580, #529, #446: relabeled from prediction/backlog to prediction/dismissed, closed - Created prediction/dismissed label (id: 1335444) — missing despite #686 implementation ## Observations - Explosive progress continues: ~30 issues closed since last run (2026-03-25). Bootstrap fully hardened, init smoke test passing, exec agent deployed, rent-a-human implemented. - Factory nearly idle: no backlog items existed until this run labeled #710-#713. The skill package chain is the only ready work. - Skill package initiative (#710-#715) appeared since last run — created from #709 research. Two parallel tracks with duplicates (#710/#714, #711/#715). Preferred #710 chain, flagged duplicates for gardener. - Adoption milestone 4/5 complete. #466 stuck 3 days on human decision. All technical prerequisites resolved. The human bottleneck is real. - Ship milestone entering scope: #679 (rent-a-human) and #699 (exec agent) already done. #718 (observable addressables) filed. Deploy profiles and assumptions register remain untracked. - VISION.md updated this cycle (3c97ddb) — factory primitives (resources, addressables, observables) now formally defined. Tree reflects this. - RESOURCES.md unchanged. Vault empty (no procurement requests). - Graph report clean: no cycles, no bottlenecks. Orphan issues are all closed bug fixes — expected. ## Deferred (in tree, not filed) - Ship: deploy profiles per artifact type — premature until skill package or example project demonstrates need - Ship: assumptions register — needs design decision on format - Ship: vault-gated fold transitions — vault infrastructure exists, fold logic not yet designed - Scale: plugin system, community formulas, hosted option — premature without users - Vision items: #1 (halt/resume), #2 (self-tuning), #4 (multi-VPS) — far future