chore: planner run 2026-04-11
This commit is contained in:
parent
85fecd7c2e
commit
4d82a4020f
2 changed files with 31 additions and 26 deletions
|
|
@ -1,4 +1,4 @@
|
|||
<!-- summarized-through-run: 4 -->
|
||||
<!-- summarized-through-run: 5 -->
|
||||
# Planner Memory
|
||||
Last updated: 2026-04-11
|
||||
|
||||
|
|
@ -6,27 +6,30 @@ Last updated: 2026-04-11
|
|||
- Run 1 (2026-04-05): First planning run. Established prerequisite tree from VISION.md.
|
||||
- Run 2 (2026-04-08): Foundation milestone completed. Triaged 4 predictor predictions. Filed #425, #426. Focus shifted to Adoption.
|
||||
- Run 3 (2026-04-11): Infrastructure maturity work (#641-#652, #663, #669, #671, #682). Prerequisite tree updated with Foundation+ objective.
|
||||
- Run 4 (2026-04-11): Foundation+ DONE (#647 closed). Adoption architect DONE (#689, #690 closed). Ops repo migration DONE (#688 closed — vault/evidence/sprints dirs exist). Filed #697 (example project). 0 predictions to triage.
|
||||
- Run 4 (2026-04-11): Foundation+ DONE (#647 closed). Adoption architect DONE (#689, #690 closed). Ops repo migration DONE (#688 closed). Filed #697 (example project). 0 predictions to triage.
|
||||
- Run 5 (2026-04-11): #693 (dev-poll deadlock) closed — dev pipeline reliability nearly DONE. #702 (journal hang on Qwen) new bug, in-progress. #665 (edge cold start) promoted to backlog. Priority added to #426, #697. 0 predictions to triage.
|
||||
|
||||
## Current constraint focus
|
||||
1. **Dev-poll deadlock** (#693) — in-progress bug, blocks dev agent reliability in same-container deployments. Being worked by dev-qwen.
|
||||
2. **Website observability** (#426) — vision. disinto.ai has no analytics. Blocks Adoption landing page AND Ship engagement measurement. Two downstream objectives.
|
||||
3. **Example project** (#697) — vision. Now unblocked by #688. Needs architect decomposition. Key Adoption deliverable and onboarding asset.
|
||||
4. **Deploy profiles** — not started. Vision-level design needed. Blocks Ship milestone.
|
||||
5. **Assumptions register** — not started. Blocks Ship milestone.
|
||||
1. **Website observability** (#426) — vision, priority. disinto.ai has no analytics. Blocks Adoption landing page AND Ship engagement measurement. Two downstream objectives. Longest-standing constraint.
|
||||
2. **Example project** (#697) — vision, priority. Needs architect decomposition. Key Adoption deliverable and onboarding asset.
|
||||
3. **Edge cold-start crash** (#665) — backlog. Edge container clones from forgejo before forgejo is ready. Blocks clean bootstrap. Simple fix (retry/wait loop).
|
||||
4. **Profile journal hang** (#702) — in-progress. Journal digestion hangs on local Qwen with many entries. Affects dev-agent reliability.
|
||||
5. **Deploy profiles** — not started. Vision-level design needed. Blocks Ship milestone.
|
||||
|
||||
## Patterns observed
|
||||
- Foundation milestone completed in ~10 days (2026-03-28 to 2026-04-08). Foundation+ completed in ~3 days (2026-04-08 to 2026-04-11). Infrastructure maturity accelerating.
|
||||
- Predictor-planner loop working: 7 predictions triaged across runs 2-3, all actioned. No new predictions in run 4.
|
||||
- Architect lifecycle now complete: #689 (close parent vision) and #690 (signature bug) both fixed. Architect can now decompose vision issues into sprints autonomously.
|
||||
- Ops repo structural debt resolved: #688 closed, migrate_ops_repo() auto-triggers on startup. All canonical dirs present (vault/pending|approved|fired|rejected, evidence/*, sprints/).
|
||||
- No observables exist — all addressables (website, repo, skill, github org) lack measurement. This remains the fundamental gap between Adoption and Ship.
|
||||
- Graph healthy: 207 nodes, 240 edges, no cycles, no bottlenecks. Orphans are benign (closed issues, unused formulas/labels).
|
||||
- Foundation completed in ~10 days, Foundation+ in ~3 days. Infrastructure maturity accelerating.
|
||||
- Predictor-planner loop working: 7 predictions triaged across runs 2-3. No new predictions in runs 4-5. Either predictor interval is too infrequent or system is stable.
|
||||
- Architect lifecycle complete (#689, #690 fixed). Can autonomously decompose vision issues into sprints.
|
||||
- Dev pipeline nearly reliable: #693 deadlock fixed. #702 (Qwen journal hang) is the remaining operational issue.
|
||||
- No observables exist — all addressables (website, repo, skill, github org) lack measurement. Fundamental gap between Adoption and Ship.
|
||||
- Graph healthy: 206 nodes, 246 edges, no cycles, no bottlenecks. Orphans are benign.
|
||||
- Massive fix velocity: 30+ issues closed 2026-04-10 to 2026-04-11 (infrastructure, credential, profile, entrypoint fixes).
|
||||
|
||||
## Strategic direction
|
||||
- Foundation and Foundation+ both DONE. Adoption is the active milestone.
|
||||
- Three Adoption objectives DONE (Forgejo+CI, architect lifecycle, bootstrap infrastructure). Three remain: landing page (#426), example project (#697), bootstrap verification.
|
||||
- #693 (dev-poll deadlock) is the only active bug — if resolved, dev pipeline is fully reliable.
|
||||
- #697 and #426 are both vision-level — architect should decompose them into sprint issues.
|
||||
- Do NOT file Ship/Learn issues until Adoption objectives show progress. Predictor will check.
|
||||
- RESOURCES.md and portfolio.md are empty placeholders — low priority but should be populated as addressables/observables materialize.
|
||||
- Four Adoption objectives DONE (Forgejo+CI, architect lifecycle, bootstrap infrastructure, dev pipeline reliability). Three remain: landing page (#426), example project (#697), bootstrap cold-start (#665).
|
||||
- #426 and #697 are both vision-level — architect should decompose them into sprint issues. Both now have priority label.
|
||||
- #665 is a simple bug now in backlog — should be picked up by next dev-agent run.
|
||||
- #702 is being actively worked — monitor but don't interfere.
|
||||
- Do NOT file Ship/Learn issues until Adoption objectives show progress.
|
||||
- RESOURCES.md and portfolio.md remain empty placeholders — populate as addressables/observables materialize.
|
||||
|
|
|
|||
Loading…
Add table
Add a link
Reference in a new issue