@ -18,7 +18,7 @@ Status: DONE
## Objective: Foundation — Planner gap analysis against vision
- [x] Planner formula exists (run-planner.toml v4)
- [x] planner-run.sh cron wrapper exists
- [x] Planning runs established (runs 14)
- [x] Planning runs established (runs 15)
Status: DONE
## Objective: Foundation — Multi-project support
@ -29,7 +29,7 @@ Status: DONE
## Objective: Foundation — Knowledge graph for structural defect detection
- [x] networkx package installed in agents container (#220 — closed)
- [x] build-graph.py exists in lib/
- [x] Graph report generating successfully (207 nodes, 240 edges as of 2026-04-11)
- [x] Graph report generating successfully (206 nodes, 246 edges as of 2026-04-11)
Status: DONE
## Objective: Foundation — Predictor-planner adversarial feedback loop
@ -57,8 +57,9 @@ Status: DONE
- [x] Prediction labels created during init (#225 — closed)
- [x] Ops repo migration code merged (#425 — closed)
- [x] Ops repo migration auto-triggers on agent startup (#688 — closed)
- [ ] End-to-end bootstrap verification with example project (#697 — vision)
Status: READY — migration works, needs end-to-end verification
- [ ] Edge container cold-start crash (#665 — backlog)
- [ ] End-to-end bootstrap verification with example project (#697 — vision, priority)
Status: READY — migration works, #665 blocks clean cold-start, #697 needs architect decomposition
## Objective: Adoption — Built-in Forgejo + Woodpecker CI
- [x] Docker compose with Forgejo + Woodpecker
@ -68,12 +69,12 @@ Status: DONE
## Objective: Adoption — Landing page communicating value proposition
- [x] Website addressable exists (disinto.ai)
- [ ] Website observability — no engagement measurement (#426 — vision)
- [ ] Website observability — no engagement measurement (#426 — vision, priority)
Status: BLOCKED — no evidence process connected to website
## Objective: Adoption — Example project demonstrating full lifecycle
- [x] Bootstrap path unblocked (#688 — closed)
- [ ] Example project design and implementation (#697 — vision)
- [ ] Example project design and implementation (#697 — vision, priority)
Status: BLOCKED — #697 needs architect decomposition
## Objective: Adoption — Architect lifecycle completeness
@ -82,8 +83,9 @@ Status: BLOCKED — #697 needs architect decomposition
Status: DONE
## Objective: Adoption — Dev agent pipeline reliability
- [ ] Dev-poll deadlock in same-container case (#693 — in-progress)
Status: BLOCKED — #693 being worked by dev-qwen
- [x] Dev-poll deadlock in same-container case (#693 — closed)
- [ ] Profile journal digestion hang on Qwen (#702 — in-progress)
Status: READY — #693 fixed, #702 being worked
## Objective: Ship (Fold 2) — Deploy profiles per artifact type
- [ ] No deploy profiles defined