chore: planner run 2026-04-11 (run 4)
Foundation+ DONE, Adoption architect DONE, ops migration DONE. Filed #697 (example project). Updated tree and memory. Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
This commit is contained in:
parent
1546540872
commit
85fecd7c2e
2 changed files with 43 additions and 30 deletions
|
|
@ -18,7 +18,7 @@ Status: DONE
|
|||
## Objective: Foundation — Planner gap analysis against vision
|
||||
- [x] Planner formula exists (run-planner.toml v4)
|
||||
- [x] planner-run.sh cron wrapper exists
|
||||
- [x] Planning runs established (run 1: 2026-04-05, run 2: 2026-04-08, run 3: 2026-04-11)
|
||||
- [x] Planning runs established (runs 1–4)
|
||||
Status: DONE
|
||||
|
||||
## Objective: Foundation — Multi-project support
|
||||
|
|
@ -29,7 +29,7 @@ Status: DONE
|
|||
## Objective: Foundation — Knowledge graph for structural defect detection
|
||||
- [x] networkx package installed in agents container (#220 — closed)
|
||||
- [x] build-graph.py exists in lib/
|
||||
- [x] Graph report generating successfully (208 nodes, 245 edges as of 2026-04-11)
|
||||
- [x] Graph report generating successfully (207 nodes, 240 edges as of 2026-04-11)
|
||||
Status: DONE
|
||||
|
||||
## Objective: Foundation — Predictor-planner adversarial feedback loop
|
||||
|
|
@ -46,16 +46,19 @@ Status: DONE
|
|||
- [x] Credential handling cleanup (#669, #671 — closed)
|
||||
- [x] Agent profile/journal fixes (#651, #652, #663 — closed)
|
||||
- [x] Cron intervals configured (#682 — closed)
|
||||
- [ ] Remove external flock once CLAUDE_CONFIG_DIR verified (#647 — vision, now READY)
|
||||
Status: READY — #647 is actionable now that CLAUDE_CONFIG_DIR is deployed
|
||||
- [x] Remove external flock (#647 — closed)
|
||||
Status: DONE
|
||||
|
||||
## --- FOUNDATION+ MILESTONE: DONE ---
|
||||
|
||||
## Objective: Adoption — One-command bootstrap (disinto init → disinto up)
|
||||
- [x] disinto init re-run stability (#158 — closed)
|
||||
- [x] disinto init repo creation API endpoint (#164 — closed)
|
||||
- [x] Prediction labels created during init (#225 — closed)
|
||||
- [x] Ops repo migration code merged (#425 — closed)
|
||||
- [ ] Ops repo migration auto-triggers on agent startup (#688 — backlog+priority)
|
||||
Status: BLOCKED — #688 ensure_ops_repo doesn't call migrate_ops_repo; live env still missing dirs
|
||||
- [x] Ops repo migration auto-triggers on agent startup (#688 — closed)
|
||||
- [ ] End-to-end bootstrap verification with example project (#697 — vision)
|
||||
Status: READY — migration works, needs end-to-end verification
|
||||
|
||||
## Objective: Adoption — Built-in Forgejo + Woodpecker CI
|
||||
- [x] Docker compose with Forgejo + Woodpecker
|
||||
|
|
@ -69,13 +72,18 @@ Status: DONE
|
|||
Status: BLOCKED — no evidence process connected to website
|
||||
|
||||
## Objective: Adoption — Example project demonstrating full lifecycle
|
||||
- [ ] No example project exists
|
||||
- [ ] Requires verified bootstrap (#688)
|
||||
Status: BLOCKED — depends on bootstrap completion and ops repo migration
|
||||
- [x] Bootstrap path unblocked (#688 — closed)
|
||||
- [ ] Example project design and implementation (#697 — vision)
|
||||
Status: BLOCKED — #697 needs architect decomposition
|
||||
|
||||
## Objective: Adoption — Architect lifecycle completeness
|
||||
- [ ] Architect closes parent vision issues when sprint sub-issues complete (#689 — backlog)
|
||||
Status: BLOCKED — #689 not yet implemented
|
||||
- [x] Architect closes parent vision issues when sprint sub-issues complete (#689 — closed)
|
||||
- [x] Architect-run.sh signature bug fixed (#690 — closed)
|
||||
Status: DONE
|
||||
|
||||
## Objective: Adoption — Dev agent pipeline reliability
|
||||
- [ ] Dev-poll deadlock in same-container case (#693 — in-progress)
|
||||
Status: BLOCKED — #693 being worked by dev-qwen
|
||||
|
||||
## Objective: Ship (Fold 2) — Deploy profiles per artifact type
|
||||
- [ ] No deploy profiles defined
|
||||
|
|
@ -85,8 +93,9 @@ Status: BLOCKED — not started, needs design (vision-level)
|
|||
## Objective: Ship (Fold 2) — Vault-gated fold transitions
|
||||
- [x] Vault redesign complete (#73-#77 — all closed)
|
||||
- [x] Vault PR workflow documented (docs/VAULT.md)
|
||||
- [ ] Vault directories complete in ops repo (#688 — approved/fired/rejected missing)
|
||||
Status: BLOCKED — #688 ops repo dirs needed for vault workflow
|
||||
- [x] Vault directories complete in ops repo (#688 — closed)
|
||||
- [ ] Fold transition logic not implemented
|
||||
Status: BLOCKED — needs design for fold gate mechanics
|
||||
|
||||
## Objective: Ship (Fold 2) — Engagement measurement baked into deploy pipelines
|
||||
- [ ] No engagement measurement exists
|
||||
|
|
|
|||
Loading…
Add table
Add a link
Reference in a new issue