Prerequisite Tree

Objective: Foundation — Core agent loop (dev → CI → review → merge)

  • dev-agent picks up backlog issues (dev/dev-agent.sh exists)
  • review-agent reviews PRs (review/review-pr.sh exists)
  • CI integration with Woodpecker (lib/ci-helpers.sh exists)
  • Stale in-progress recovery (#224 — closed)
  • Agent race condition fix (#160 — closed)
  • Dispatcher grep Alpine fix (#150 — closed) Status: DONE

Objective: Foundation — Supervisor health monitoring

  • supervisor-run.sh exists and runs via cron
  • preflight.sh collects health data Status: DONE

Objective: Foundation — Planner gap analysis against vision

  • Planner formula exists (run-planner.toml v4)
  • planner-run.sh cron wrapper exists
  • Planning runs established (runs 14) Status: DONE

Objective: Foundation — Multi-project support

  • Per-project TOML config (projects/*.toml)
  • load-project.sh helper Status: DONE

Objective: Foundation — Knowledge graph for structural defect detection

  • networkx package installed in agents container (#220 — closed)
  • build-graph.py exists in lib/
  • Graph report generating successfully (207 nodes, 240 edges as of 2026-04-11) Status: DONE

Objective: Foundation — Predictor-planner adversarial feedback loop

  • Predictor formula exists (run-predictor.toml)
  • Planner prediction triage step defined
  • Prediction workflow labels created on Forgejo (#225 — closed)
  • Predictor filing predictions (7 predictions triaged across runs 2-3) Status: DONE

--- FOUNDATION MILESTONE: DONE ---

Objective: Foundation+ — Infrastructure maturity

  • CLAUDE_CONFIG_DIR rollout (#641-#646 — all closed)
  • Credential handling cleanup (#669, #671 — closed)
  • Agent profile/journal fixes (#651, #652, #663 — closed)
  • Cron intervals configured (#682 — closed)
  • Remove external flock (#647 — closed) Status: DONE

--- FOUNDATION+ MILESTONE: DONE ---

Objective: Adoption — One-command bootstrap (disinto init → disinto up)

  • disinto init re-run stability (#158 — closed)
  • disinto init repo creation API endpoint (#164 — closed)
  • Prediction labels created during init (#225 — closed)
  • Ops repo migration code merged (#425 — closed)
  • Ops repo migration auto-triggers on agent startup (#688 — closed)
  • End-to-end bootstrap verification with example project (#697 — vision) Status: READY — migration works, needs end-to-end verification

Objective: Adoption — Built-in Forgejo + Woodpecker CI

  • Docker compose with Forgejo + Woodpecker
  • Woodpecker OAuth2 redirect URI fix (#172 — closed)
  • WOODPECKER_HOST override fix (#178 — closed) Status: DONE

Objective: Adoption — Landing page communicating value proposition

  • Website addressable exists (disinto.ai)
  • Website observability — no engagement measurement (#426 — vision) Status: BLOCKED — no evidence process connected to website

Objective: Adoption — Example project demonstrating full lifecycle

  • Bootstrap path unblocked (#688 — closed)
  • Example project design and implementation (#697 — vision) Status: BLOCKED — #697 needs architect decomposition

Objective: Adoption — Architect lifecycle completeness

  • Architect closes parent vision issues when sprint sub-issues complete (#689 — closed)
  • Architect-run.sh signature bug fixed (#690 — closed) Status: DONE

Objective: Adoption — Dev agent pipeline reliability

  • Dev-poll deadlock in same-container case (#693 — in-progress) Status: BLOCKED — #693 being worked by dev-qwen

Objective: Ship (Fold 2) — Deploy profiles per artifact type

  • No deploy profiles defined
  • CI pipeline working (Woodpecker OAuth fixed) Status: BLOCKED — not started, needs design (vision-level)

Objective: Ship (Fold 2) — Vault-gated fold transitions

  • Vault redesign complete (#73-#77 — all closed)
  • Vault PR workflow documented (docs/VAULT.md)
  • Vault directories complete in ops repo (#688 — closed)
  • Fold transition logic not implemented Status: BLOCKED — needs design for fold gate mechanics

Objective: Ship (Fold 2) — Engagement measurement baked into deploy pipelines

  • No engagement measurement exists
  • No observables yet (AGENTS.md confirms) Status: BLOCKED — depends on deploy profiles + website observability (#426)

Objective: Ship (Fold 2) — Rent-a-human for gated channels

  • run-rent-a-human formula exists
  • Not yet exercised in production Status: READY

Objective: Ship (Fold 2) — Assumptions register

  • No assumptions register exists Status: BLOCKED — not started

Objective: Learn (Fold 3) — Observable-driven planning

  • No observables exist yet Status: BLOCKED — depends on Ship milestone (engagement measurement)

Objective: Learn (Fold 3) — Predictor challenges assumptions against signals

  • Requires observables + assumptions register Status: BLOCKED — depends on Ship milestone

Objective: Learn (Fold 3) — Audience variation + signal detection

  • Requires observables Status: BLOCKED — depends on Ship milestone