chore: planner run 2026-04-12
This commit is contained in:
parent
6219d7bdf0
commit
d182005d4b
2 changed files with 29 additions and 28 deletions
|
|
@ -1,32 +1,32 @@
|
|||
<!-- summarized-through-run: 4 -->
|
||||
<!-- summarized-through-run: 5 -->
|
||||
# Planner Memory
|
||||
Last updated: 2026-04-11
|
||||
Last updated: 2026-04-12
|
||||
|
||||
## Run history
|
||||
- Run 1 (2026-04-05): First planning run. Established prerequisite tree from VISION.md.
|
||||
- Run 2 (2026-04-08): Foundation milestone completed. Triaged 4 predictor predictions. Filed #425, #426. Focus shifted to Adoption.
|
||||
- Run 3 (2026-04-11): Infrastructure maturity work (#641-#652, #663, #669, #671, #682). Prerequisite tree updated with Foundation+ objective.
|
||||
- Run 4 (2026-04-11): Foundation+ DONE (#647 closed). Adoption architect DONE (#689, #690 closed). Ops repo migration DONE (#688 closed — vault/evidence/sprints dirs exist). Filed #697 (example project). 0 predictions to triage.
|
||||
- Run 2 (2026-04-08): Foundation milestone completed. Triaged 4 predictor predictions. Filed #425, #426.
|
||||
- Run 3 (2026-04-11): Infrastructure maturity work (#641-#652, #663, #669, #671, #682).
|
||||
- Run 4 (2026-04-11): Foundation+ DONE. Adoption architect DONE (#689, #690). Ops migration DONE (#688). Filed #697.
|
||||
- Run 5 (2026-04-12): Dev pipeline reliability DONE (#693, #702 closed). Chat 8/10 (#710, #713 closed). Found architect false-completion bug → filed #735. 0 predictions.
|
||||
|
||||
## Current constraint focus
|
||||
1. **Dev-poll deadlock** (#693) — in-progress bug, blocks dev agent reliability in same-container deployments. Being worked by dev-qwen.
|
||||
2. **Website observability** (#426) — vision. disinto.ai has no analytics. Blocks Adoption landing page AND Ship engagement measurement. Two downstream objectives.
|
||||
3. **Example project** (#697) — vision. Now unblocked by #688. Needs architect decomposition. Key Adoption deliverable and onboarding asset.
|
||||
4. **Deploy profiles** — not started. Vision-level design needed. Blocks Ship milestone.
|
||||
5. **Assumptions register** — not started. Blocks Ship milestone.
|
||||
1. **Architect false-completion bug** (#735) — backlog, priority. `get_vision_subissues()` Method 2 matches unrelated sub-issues, spams false completion comments on #426/#697. Blocks reliable architect lifecycle and vision issue decomposition.
|
||||
2. **Website observability** (#426) — vision, priority. disinto.ai has no analytics. Blocks Adoption landing page AND Ship engagement measurement. Two downstream objectives.
|
||||
3. **Example project** (#697) — vision, priority. Needs architect decomposition. Key Adoption deliverable.
|
||||
4. **Chat ci_exhausted** (#707, #712) — both blocked, ci_exhausted. #712 has stale PR #733. These are the last 2 of 10 sub-issues for #623.
|
||||
5. **Deploy profiles** — not started. Vision-level. Blocks Ship milestone.
|
||||
|
||||
## Patterns observed
|
||||
- Foundation milestone completed in ~10 days (2026-03-28 to 2026-04-08). Foundation+ completed in ~3 days (2026-04-08 to 2026-04-11). Infrastructure maturity accelerating.
|
||||
- Predictor-planner loop working: 7 predictions triaged across runs 2-3, all actioned. No new predictions in run 4.
|
||||
- Architect lifecycle now complete: #689 (close parent vision) and #690 (signature bug) both fixed. Architect can now decompose vision issues into sprints autonomously.
|
||||
- Ops repo structural debt resolved: #688 closed, migrate_ops_repo() auto-triggers on startup. All canonical dirs present (vault/pending|approved|fired|rejected, evidence/*, sprints/).
|
||||
- No observables exist — all addressables (website, repo, skill, github org) lack measurement. This remains the fundamental gap between Adoption and Ship.
|
||||
- Graph healthy: 207 nodes, 240 edges, no cycles, no bottlenecks. Orphans are benign (closed issues, unused formulas/labels).
|
||||
- Foundation completed in ~10 days, Foundation+ in ~3 days, dev pipeline reliability in ~1 day. Execution velocity increasing.
|
||||
- Chat assistant (#623) rapid progress: 6/10 → 8/10 sub-issues in one day. Final 2 are ci_exhausted — CI reliability is now the bottleneck, not implementation.
|
||||
- Architect lifecycle has a sub-issue matching bug (#735) — Method 2 in get_vision_subissues() creates false positives from unrelated ops repo PRs. This may be preventing architect from properly decomposing #426 and #697.
|
||||
- No predictor activity (0 predictions in runs 4-5). Either predictor is idle or all patterns are accounted for.
|
||||
- No observables exist — all addressables still lack measurement. Fundamental gap unchanged.
|
||||
- Graph healthy: 201 nodes, 266 edges, no cycles, no bottlenecks.
|
||||
|
||||
## Strategic direction
|
||||
- Foundation and Foundation+ both DONE. Adoption is the active milestone.
|
||||
- Three Adoption objectives DONE (Forgejo+CI, architect lifecycle, bootstrap infrastructure). Three remain: landing page (#426), example project (#697), bootstrap verification.
|
||||
- #693 (dev-poll deadlock) is the only active bug — if resolved, dev pipeline is fully reliable.
|
||||
- #697 and #426 are both vision-level — architect should decompose them into sprint issues.
|
||||
- Do NOT file Ship/Learn issues until Adoption objectives show progress. Predictor will check.
|
||||
- RESOURCES.md and portfolio.md are empty placeholders — low priority but should be populated as addressables/observables materialize.
|
||||
- Adoption is the active milestone. 5 of 8 Adoption objectives DONE.
|
||||
- **Critical path**: #735 (architect bug) → architect decomposes #426 and #697 → Adoption objectives unblock.
|
||||
- Chat (#623) is 80% done. Remaining 2 issues are ci_exhausted — may resolve on retry or need investigation.
|
||||
- Do NOT file Ship/Learn issues until Adoption objectives show progress.
|
||||
- RESOURCES.md and portfolio.md remain empty — populate when addressables materialize.
|
||||
|
|
|
|||
Loading…
Add table
Add a link
Reference in a new issue