Planner Memory
Last updated: 2026-04-12
Run history
- Run 1 (2026-04-05): First planning run. Established prerequisite tree from VISION.md.
- Run 2 (2026-04-08): Foundation milestone completed. Triaged 4 predictor predictions. Filed #425, #426.
- Run 3 (2026-04-11): Infrastructure maturity work (#641-#652, #663, #669, #671, #682).
- Run 4 (2026-04-11): Foundation+ DONE. Adoption architect DONE (#689, #690). Ops migration DONE (#688). Filed #697.
- Run 5 (2026-04-12): Dev pipeline reliability DONE (#693, #702 closed). Chat 8/10 (#710, #713 closed). Found architect false-completion bug → filed #735. 0 predictions.
Current constraint focus
- Architect false-completion bug (#735) — backlog, priority.
get_vision_subissues()Method 2 matches unrelated sub-issues, spams false completion comments on #426/#697. Blocks reliable architect lifecycle and vision issue decomposition. - Website observability (#426) — vision, priority. disinto.ai has no analytics. Blocks Adoption landing page AND Ship engagement measurement. Two downstream objectives.
- Example project (#697) — vision, priority. Needs architect decomposition. Key Adoption deliverable.
- Chat ci_exhausted (#707, #712) — both blocked, ci_exhausted. #712 has stale PR #733. These are the last 2 of 10 sub-issues for #623.
- Deploy profiles — not started. Vision-level. Blocks Ship milestone.
Patterns observed
- Foundation completed in ~10 days, Foundation+ in ~3 days, dev pipeline reliability in ~1 day. Execution velocity increasing.
- Chat assistant (#623) rapid progress: 6/10 → 8/10 sub-issues in one day. Final 2 are ci_exhausted — CI reliability is now the bottleneck, not implementation.
- Architect lifecycle has a sub-issue matching bug (#735) — Method 2 in get_vision_subissues() creates false positives from unrelated ops repo PRs. This may be preventing architect from properly decomposing #426 and #697.
- No predictor activity (0 predictions in runs 4-5). Either predictor is idle or all patterns are accounted for.
- No observables exist — all addressables still lack measurement. Fundamental gap unchanged.
- Graph healthy: 201 nodes, 266 edges, no cycles, no bottlenecks.
Strategic direction
- Adoption is the active milestone. 5 of 8 Adoption objectives DONE.
- Critical path: #735 (architect bug) → architect decomposes #426 and #697 → Adoption objectives unblock.
- Chat (#623) is 80% done. Remaining 2 issues are ci_exhausted — may resolve on retry or need investigation.
- Do NOT file Ship/Learn issues until Adoption objectives show progress.
- RESOURCES.md and portfolio.md remain empty — populate when addressables materialize.