- Updated prerequisite tree: Nomad+Vault orchestration (Steps 0–4) DONE
- #425 closed, #758 HUMAN_BLOCKED (ops repo branch protection)
- Created vault/pending/disinto-ops-branch-protection.md
- Created vault lifecycle directories (pending/, approved/, fired/, rejected/)
- Closed #947 (already fixed by #948 )
- Graph: 224 nodes, 251 edges, healthy
2026-04-17 14:44:43 +00:00
planner-bot
20abab0633
chore: migrate ops repo structure to canonical layout
2026-04-17 01:00:42 +00:00
bb37eaf588
Merge pull request 'architect: supervisor Docker storage telemetry' ( #34 ) from architect/supervisor-docker-storage into main
2026-04-15 17:39:19 +00:00
590cf45139
Merge pull request 'architect: process evolution lifecycle' ( #35 ) from architect/process-evolution-lifecycle into main
2026-04-15 17:39:12 +00:00
8fe5da6b57
Merge pull request 'architect: supervisor project-wide oversight' ( #32 ) from architect/supervisor-project-wide-oversight into main
2026-04-15 17:39:09 +00:00
e3a4eb352d
Merge pull request 'architect: gatekeeper agent — external signal verification' ( #31 ) from architect/gatekeeper-agent into main
2026-04-15 17:39:03 +00:00
a66af9246e
Merge pull request 'architect: bug-report pipeline — inbound classification + auto-close' ( #24 ) from architect/bug-report-pipeline into main
2026-04-15 17:38:55 +00:00
40352a7d27
Merge pull request 'architect: agent management redesign' ( #21 ) from architect/agent-management-redesign into main
2026-04-15 17:38:54 +00:00
e73cb59efb
Merge pull request 'architect: example project — full lifecycle demo' ( #20 ) from architect/example-project-lifecycle into main
2026-04-15 17:38:46 +00:00
fffb791637
Merge pull request 'architect: vault blast-radius tiers' ( #12 ) from architect/vault-blast-radius-tiers into main
2026-04-15 17:38:35 +00:00
ed1e4882b2
Merge pull request 'architect: versioned agent images' ( #11 ) from architect/versioned-agent-images into main
2026-04-15 17:38:33 +00:00
247e03024a
Merge pull request 'architect: website observability wire-up' ( #10 ) from architect/website-observability-wire-up into main
2026-04-15 17:38:11 +00:00
architect-bot
e11fd85c9a
sprint: add process-evolution-lifecycle.md
2026-04-15 10:06:02 +00:00
34ba6680d1
sprint: add supervisor-docker-storage.md
2026-04-15 09:13:15 +00:00
51a33bb0f1
sprint: add supervisor-project-wide-oversight.md
2026-04-15 07:25:10 +00:00
1715b2480b
sprint: add gatekeeper-agent.md
2026-04-15 03:02:57 +00:00
a3f2723626
sprint: add bug-report-pipeline.md
2026-04-12 04:09:56 +00:00
90789cbb5a
sprint: add agent-management-redesign.md
2026-04-12 02:02:51 +00:00
17f350d7a3
sprint: add example-project-lifecycle.md
2026-04-12 01:00:26 +00:00
75f06bd313
sprint: add design forks for website-observability-wire-up
2026-04-12 00:58:08 +00:00
a5cbaae2b4
Merge pull request 'sprint(versioned-agent-images): add side-effects, follow-up sprints, updated recommendation' ( #15 ) from architect/versioned-agent-images-followups into architect/versioned-agent-images
...
Reviewed-on: #15
Reviewed-by: disinto-admin <admin@disinto.local>
2026-04-11 10:20:07 +00:00
3a172bcc86
sprint(versioned-agent-images): add side-effects, four follow-up sprints, updated recommendation
...
Enriches the architect's existing sprint plan with:
1. Side effects: this sprint indirectly closes #665 (edge cold-start race) by
removing the runtime clone — flagging so a parallel #665 fix isn't applied.
2. Four follow-up sprints that complete the client-box upgrade story:
- A: 'disinto upgrade <version>' subcommand for atomic client-side upgrades
- B: unify DISINTO_VERSION and AGENTS_IMAGE into one version concept
- C: migration framework for breaking changes (per-version migration files)
- D: bootstrap-from-broken-state runbook for existing drifted boxes (harb)
3. Updated recommendation that sequences the follow-ups against this sprint
and notes #665 should not be fixed in parallel.
The original sprint scope (4 files, ~80% gluecode, GHCR) is unchanged and
remains tightly scoped. The follow-ups are deliberately kept inside this
document rather than filed as separate forge issues until the sprint plan is
ready to be broken into sub-issues by the architect.
2026-04-11 10:09:57 +00:00
a357297479
Merge pull request 'release: v0.2.0' ( #14 ) from release/v020 into main
2026-04-09 20:37:37 +00:00
Smoke Test
a0323564e6
release: v0.2.0
...
Release v0.2.0
This PR creates a vault item for the release of version v0.2.0.
## Changes
- Added vault item: release-v020.toml
## Next Steps
1. Review this PR
2. Approve and merge
3. The vault runner will execute the release formula
2026-04-09 20:35:48 +00:00
7a4ab03aac
Merge pull request 'release: v0.1.1' ( #13 ) from release/v011 into main
2026-04-09 17:49:26 +00:00
Smoke Test
f12de86360
release: v0.1.1
...
Release v0.1.1
This PR creates a vault item for the release of version v0.1.1.
## Changes
- Added vault item: release-v011.toml
## Next Steps
1. Review this PR
2. Approve and merge
3. The vault runner will execute the release formula
2026-04-09 17:46:16 +00:00
174e2a63bf
sprint: add vault-blast-radius-tiers.md
2026-04-09 08:33:51 +00:00
Architect Agent
eb7b403148
sprint: add versioned-agent-images.md
2026-04-09 08:31:46 +00:00
326ebb867a
sprint: add website-observability-wire-up.md
2026-04-08 20:04:29 +00:00
0c0045820d
Merge pull request 'architect: vault blast-radius tiers' ( #9 ) from architect/vault-blast-radius-tiers into main
2026-04-08 19:08:05 +00:00
708901e4e2
sprint: add design forks and proposed sub-issues
2026-04-08 18:48:21 +00:00
planner-bot
e756c3eae9
chore: planner run 2026-04-08
2026-04-08 12:06:13 +00:00
7afe8bf145
sprint: add vault-blast-radius-tiers.md
2026-04-08 10:28:17 +00:00
d033dff89e
Merge pull request 'chore: planner run 2026-04-05 — initial prerequisite tree and memory' ( #8 ) from planner/run-2026-04-05 into main
2026-04-05 15:05:51 +00:00
planner-bot
82b361e813
chore: planner run 2026-04-05
2026-04-05 15:01:21 +00:00
a43df81029
Merge pull request 'release: v0.2.0' ( #7 ) from release/v020 into main
2026-04-03 09:10:07 +00:00
Smoke Test
935d8059e2
release: v0.2.0
...
Release v0.2.0
This PR creates a vault item for the release of version v0.2.0.
## Changes
- Added vault item: release-v020.toml
## Next Steps
1. Review this PR
2. Approve and merge
3. The vault runner will execute the release formula
2026-04-03 07:33:29 +00:00
johba
5b9f3efd85
Merge pull request 'vault: release v0.1.1' ( #5 ) from vault/release-v0.1.1-admin into main
2026-04-02 16:22:22 +00:00
Smoke Test
f3d7077d96
vault: release v0.1.1
2026-04-02 16:22:07 +00:00
Smoke Test
1416e43ec3
clean: remove old release TOMLs
2026-04-02 16:22:06 +00:00
8148a6b8f5
Merge pull request 'vault: release v0.1.1' ( #4 ) from vault/release-v0.1.1 into main
2026-04-02 15:52:52 +00:00
Smoke Test
ce59b72a76
vault: release v0.1.1
2026-04-02 15:52:40 +00:00
1ad1326b8e
Merge pull request 'vault: release v0.2.0' ( #3 ) from vault/release-v0.2.0-proper into main
2026-04-01 19:52:58 +00:00
johba
4d43b96a61
vault: release v0.2.0
2026-04-01 19:52:47 +00:00
johba
f3fa175ebd
revert: remove release TOML (must come via PR)
2026-04-01 19:52:37 +00:00
johba
3ed051da13
vault: release v0.2.0 (fixed schema)
2026-04-01 19:49:25 +00:00
johba
e561e37299
vault: release v0.2.0
2026-04-01 19:43:50 +00:00
johba
11572ff82a
vault: release v0.1.0
2026-04-01 17:26:23 +00:00
3dd9a02957
Initial commit