Compare commits

...
Sign in to create a new pull request.

6 commits

Author SHA1 Message Date
planner-bot
d182005d4b chore: planner run 2026-04-12 2026-04-12 04:41:51 +00:00
planner-bot
6219d7bdf0 chore: planner run 2026-04-12 2026-04-12 03:34:08 +00:00
planner-bot
84da19ea42 chore: planner run 2026-04-12 2026-04-12 02:06:46 +00:00
planner-bot
85fecd7c2e chore: planner run 2026-04-11 (run 4)
Foundation+ DONE, Adoption architect DONE, ops migration DONE.
Filed #697 (example project). Updated tree and memory.

Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-04-11 22:17:43 +00:00
planner-bot
1546540872 chore: migrate ops repo structure to canonical layout 2026-04-11 22:12:52 +00:00
planner-bot
2ad6c8d45e chore: planner run 2026-04-11
- Triaged 3 predictions (#466, #467, #468 — all actioned)
- Filed #688 (ops repo auto-migration) and #689 (architect lifecycle)
- Promoted #647 (remove external flock) from vision to backlog
- Updated prerequisite tree: Foundation+ infra maturity objective added,
  graph stats updated (208 nodes, 245 edges), #688 replaces #425 as blocker

Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-04-11 20:38:30 +00:00
15 changed files with 84 additions and 30 deletions

5
RESOURCES.md Normal file
View file

@ -0,0 +1,5 @@
# RESOURCES
## Overview
<!-- Add content here -->

View file

View file

View file

View file

View file

0
knowledge/.gitkeep Normal file
View file

View file

@ -1,28 +1,32 @@
<!-- summarized-through-run: 2 -->
<!-- summarized-through-run: 5 -->
# Planner Memory
Last updated: 2026-04-08
Last updated: 2026-04-12
## Run history
- Run 1 (2026-04-05): First planning run. Established prerequisite tree from VISION.md.
- Run 2 (2026-04-08): Foundation milestone completed. All 5 blockers resolved. Triaged 4 predictor predictions (all actioned). Filed #425 (ops repo migration) and #426 (website observability). Focus shifted to Adoption milestone.
- Run 2 (2026-04-08): Foundation milestone completed. Triaged 4 predictor predictions. Filed #425, #426.
- Run 3 (2026-04-11): Infrastructure maturity work (#641-#652, #663, #669, #671, #682).
- Run 4 (2026-04-11): Foundation+ DONE. Adoption architect DONE (#689, #690). Ops migration DONE (#688). Filed #697.
- Run 5 (2026-04-12): Dev pipeline reliability DONE (#693, #702 closed). Chat 8/10 (#710, #713 closed). Found architect false-completion bug → filed #735. 0 predictions.
## Current constraint focus
1. **Ops repo migration** (#425) — existing deployments missing evidence/, sprints/, portfolio.md, RESOURCES.md, vault subdirs. Blocks evidence collection for all agents. Priority+backlog.
2. **Website observability** (#426) — disinto.ai has no analytics/measurement. Blocks Adoption landing page and Ship engagement measurement. Vision-level (design decisions needed).
3. **Example project** — none exists. Blocked on bootstrap verification after #425.
4. **Deploy profiles** — not started. Vision-level design needed for per-artifact-type deployment.
5. **Assumptions register** — not started. Ship (Fold 2) prerequisite.
1. **Architect false-completion bug** (#735) — backlog, priority. `get_vision_subissues()` Method 2 matches unrelated sub-issues, spams false completion comments on #426/#697. Blocks reliable architect lifecycle and vision issue decomposition.
2. **Website observability** (#426) — vision, priority. disinto.ai has no analytics. Blocks Adoption landing page AND Ship engagement measurement. Two downstream objectives.
3. **Example project** (#697) — vision, priority. Needs architect decomposition. Key Adoption deliverable.
4. **Chat ci_exhausted** (#707, #712) — both blocked, ci_exhausted. #712 has stale PR #733. These are the last 2 of 10 sub-issues for #623.
5. **Deploy profiles** — not started. Vision-level. Blocks Ship milestone.
## Patterns observed
- Foundation milestone completed in ~10 days (2026-03-28 to 2026-04-08). High bug fix velocity once dev-agent pipeline was reliable.
- Predictor-planner loop working: predictor filed 4 accurate predictions, planner actioned all 4. The adversarial feedback catches stale state and planner drift effectively.
- Predictor correctly identified planner filing Fold 2/3 vision issues (#418, #419) while Foundation was incomplete — planner must verify milestone completion before advancing.
- Ops repo structural debt: setup_ops_repo() creates dirs for new repos but doesn't migrate existing ones. Pattern will recur with future schema changes.
- No observables exist — all 4 addressables (website, repo, skill, github org) lack measurement. This is the fundamental gap between Adoption and Ship.
- Foundation completed in ~10 days, Foundation+ in ~3 days, dev pipeline reliability in ~1 day. Execution velocity increasing.
- Chat assistant (#623) rapid progress: 6/10 → 8/10 sub-issues in one day. Final 2 are ci_exhausted — CI reliability is now the bottleneck, not implementation.
- Architect lifecycle has a sub-issue matching bug (#735) — Method 2 in get_vision_subissues() creates false positives from unrelated ops repo PRs. This may be preventing architect from properly decomposing #426 and #697.
- No predictor activity (0 predictions in runs 4-5). Either predictor is idle or all patterns are accounted for.
- No observables exist — all addressables still lack measurement. Fundamental gap unchanged.
- Graph healthy: 201 nodes, 266 edges, no cycles, no bottlenecks.
## Strategic direction
- Foundation DONE. Adoption is now the active milestone.
- #425 is the single blocking issue — once ops repo dirs exist, evidence collection unblocks and bootstrap is complete.
- After #425: focus on example project (demonstrates full lifecycle) and website observability (#426).
- Do NOT file Ship/Learn issues until Adoption objectives show progress. Predictor will check.
- Graph report is healthy: 165 nodes, 137 edges, no cycles, no bottlenecks. 7 orphans are benign (closed issues, unused formulas/labels).
- Adoption is the active milestone. 5 of 8 Adoption objectives DONE.
- **Critical path**: #735 (architect bug) → architect decomposes #426 and #697 → Adoption objectives unblock.
- Chat (#623) is 80% done. Remaining 2 issues are ci_exhausted — may resolve on retry or need investigation.
- Do NOT file Ship/Learn issues until Adoption objectives show progress.
- RESOURCES.md and portfolio.md remain empty — populate when addressables materialize.

5
portfolio.md Normal file
View file

@ -0,0 +1,5 @@
# Portfolio
## Overview
<!-- Add content here -->

View file

@ -1,5 +1,5 @@
# Prerequisite Tree
<!-- Last updated: 2026-04-08 -->
<!-- Last updated: 2026-04-12 -->
## Objective: Foundation — Core agent loop (dev → CI → review → merge)
- [x] dev-agent picks up backlog issues (dev/dev-agent.sh exists)
@ -18,7 +18,7 @@ Status: DONE
## Objective: Foundation — Planner gap analysis against vision
- [x] Planner formula exists (run-planner.toml v4)
- [x] planner-run.sh cron wrapper exists
- [x] Planning runs established and maintaining prerequisite tree (run 1: 2026-04-05, run 2: 2026-04-08)
- [x] Planning runs established (runs 15)
Status: DONE
## Objective: Foundation — Multi-project support
@ -29,24 +29,36 @@ Status: DONE
## Objective: Foundation — Knowledge graph for structural defect detection
- [x] networkx package installed in agents container (#220 — closed)
- [x] build-graph.py exists in lib/
- [x] Graph report generating successfully (165 nodes, 137 edges as of 2026-04-08)
- [x] Graph report generating successfully (201 nodes, 266 edges as of 2026-04-12)
Status: DONE
## Objective: Foundation — Predictor-planner adversarial feedback loop
- [x] Predictor formula exists (run-predictor.toml)
- [x] Planner prediction triage step defined
- [x] Prediction workflow labels created on Forgejo (#225 — closed)
- [x] Predictor filing predictions (4 predictions triaged in run 2)
- [x] Predictor filing predictions (7 predictions triaged across runs 2-3)
Status: DONE
## --- FOUNDATION MILESTONE: DONE ---
## Objective: Foundation+ — Infrastructure maturity
- [x] CLAUDE_CONFIG_DIR rollout (#641-#646 — all closed)
- [x] Credential handling cleanup (#669, #671 — closed)
- [x] Agent profile/journal fixes (#651, #652, #663 — closed)
- [x] Cron intervals configured (#682 — closed)
- [x] Remove external flock (#647 — closed)
Status: DONE
## --- FOUNDATION+ MILESTONE: DONE ---
## Objective: Adoption — One-command bootstrap (disinto init → disinto up)
- [x] disinto init re-run stability (#158 — closed)
- [x] disinto init repo creation API endpoint (#164 — closed)
- [x] Prediction labels created during init (#225 — closed)
- [ ] Ops repo migration for existing deployments (#425 — backlog+priority)
Status: BLOCKED — #425 ops repo missing dirs on existing deployments
- [x] Ops repo migration code merged (#425 — closed)
- [x] Ops repo migration auto-triggers on agent startup (#688 — closed)
- [ ] End-to-end bootstrap verification with example project (#697 — vision)
Status: READY — migration works, needs end-to-end verification
## Objective: Adoption — Built-in Forgejo + Woodpecker CI
- [x] Docker compose with Forgejo + Woodpecker
@ -56,13 +68,40 @@ Status: DONE
## Objective: Adoption — Landing page communicating value proposition
- [x] Website addressable exists (disinto.ai)
- [ ] Website observability — no engagement measurement (#426 — vision)
- [ ] Website observability — no engagement measurement (#426 — vision, priority)
Status: BLOCKED — no evidence process connected to website
## Objective: Adoption — Example project demonstrating full lifecycle
- [ ] No example project exists
- [ ] Requires verified bootstrap (#425)
Status: BLOCKED — depends on bootstrap completion and ops repo migration
- [x] Bootstrap path unblocked (#688 — closed)
- [ ] Example project design and implementation (#697 — vision, priority)
Status: BLOCKED — #697 needs architect decomposition
## Objective: Adoption — Architect lifecycle completeness
- [x] Architect closes parent vision issues when sprint sub-issues complete (#689 — closed)
- [x] Architect-run.sh signature bug fixed (#690 — closed)
- [x] Architect review response handling fixed (#718 — closed)
- [x] Architect URL construction fixed (#717 — closed)
- [x] Architect pitch output fixed (#716 — closed)
- [ ] Architect false-completion bug — matches unrelated sub-issues (#735 — backlog, priority)
Status: IN PROGRESS — #735 blocks reliable vision issue lifecycle
## Objective: Adoption — Dev agent pipeline reliability
- [x] Dev-poll deadlock in same-container case (#693 — closed)
- [x] Profile journal digestion hang (#702 — closed)
Status: DONE
## Objective: Adoption — Assistant (disinto-chat) (#623)
- [x] Caddy subpath routing skeleton (#704 — closed)
- [x] Chat container scaffold (#705 — closed)
- [x] Chat sandbox hardening (#706 — closed)
- [x] Forgejo OAuth gate (#708 — closed)
- [x] Caddy Remote-User forwarding + validation (#709 — closed)
- [x] Cost caps + rate limiting (#711 — closed)
- [x] Conversation history persistence (#710 — closed)
- [x] Per-project subdomain fallback (#713 — closed)
- [ ] Claude identity isolation (#707 — blocked, ci_exhausted)
- [ ] Escalation tools (#712 — blocked, ci_exhausted, has PR #733)
Status: IN PROGRESS — 8/10 sub-issues closed, 2 blocked (both ci_exhausted)
## Objective: Ship (Fold 2) — Deploy profiles per artifact type
- [ ] No deploy profiles defined
@ -72,8 +111,9 @@ Status: BLOCKED — not started, needs design (vision-level)
## Objective: Ship (Fold 2) — Vault-gated fold transitions
- [x] Vault redesign complete (#73-#77 — all closed)
- [x] Vault PR workflow documented (docs/VAULT.md)
- [ ] Vault directories complete in ops repo (#425 — approved/fired/rejected missing)
Status: BLOCKED — #425 ops repo dirs needed for vault workflow
- [x] Vault directories complete in ops repo (#688 — closed)
- [ ] Fold transition logic not implemented
Status: BLOCKED — needs design for fold gate mechanics
## Objective: Ship (Fold 2) — Engagement measurement baked into deploy pipelines
- [ ] No engagement measurement exists

0
sprints/.gitkeep Normal file
View file

0
vault/approved/.gitkeep Normal file
View file

0
vault/fired/.gitkeep Normal file
View file

0
vault/pending/.gitkeep Normal file
View file

0
vault/rejected/.gitkeep Normal file
View file