4.3 KiB
4.3 KiB
Prerequisite Tree
Objective: Foundation — Core agent loop (dev → CI → review → merge)
- dev-agent picks up backlog issues (dev/dev-agent.sh exists)
- review-agent reviews PRs (review/review-pr.sh exists)
- CI integration with Woodpecker (lib/ci-helpers.sh exists)
- Stale in-progress recovery (#224 — closed)
- Agent race condition fix (#160 — closed)
- Dispatcher grep Alpine fix (#150 — closed) Status: DONE
Objective: Foundation — Supervisor health monitoring
- supervisor-run.sh exists and runs via cron
- preflight.sh collects health data Status: DONE
Objective: Foundation — Planner gap analysis against vision
- Planner formula exists (run-planner.toml v4)
- planner-run.sh cron wrapper exists
- Planning runs established and maintaining prerequisite tree (run 1: 2026-04-05, run 2: 2026-04-08) Status: DONE
Objective: Foundation — Multi-project support
- Per-project TOML config (projects/*.toml)
- load-project.sh helper Status: DONE
Objective: Foundation — Knowledge graph for structural defect detection
- networkx package installed in agents container (#220 — closed)
- build-graph.py exists in lib/
- Graph report generating successfully (165 nodes, 137 edges as of 2026-04-08) Status: DONE
Objective: Foundation — Predictor-planner adversarial feedback loop
- Predictor formula exists (run-predictor.toml)
- Planner prediction triage step defined
- Prediction workflow labels created on Forgejo (#225 — closed)
- Predictor filing predictions (4 predictions triaged in run 2) Status: DONE
--- FOUNDATION MILESTONE: DONE ---
Objective: Adoption — One-command bootstrap (disinto init → disinto up)
- disinto init re-run stability (#158 — closed)
- disinto init repo creation API endpoint (#164 — closed)
- Prediction labels created during init (#225 — closed)
- Ops repo migration for existing deployments (#425 — backlog+priority) Status: BLOCKED — #425 ops repo missing dirs on existing deployments
Objective: Adoption — Built-in Forgejo + Woodpecker CI
- Docker compose with Forgejo + Woodpecker
- Woodpecker OAuth2 redirect URI fix (#172 — closed)
- WOODPECKER_HOST override fix (#178 — closed) Status: DONE
Objective: Adoption — Landing page communicating value proposition
- Website addressable exists (disinto.ai)
- Website observability — no engagement measurement (#426 — vision) Status: BLOCKED — no evidence process connected to website
Objective: Adoption — Example project demonstrating full lifecycle
- No example project exists
- Requires verified bootstrap (#425) Status: BLOCKED — depends on bootstrap completion and ops repo migration
Objective: Ship (Fold 2) — Deploy profiles per artifact type
- No deploy profiles defined
- CI pipeline working (Woodpecker OAuth fixed) Status: BLOCKED — not started, needs design (vision-level)
Objective: Ship (Fold 2) — Vault-gated fold transitions
- Vault redesign complete (#73-#77 — all closed)
- Vault PR workflow documented (docs/VAULT.md)
- Vault directories complete in ops repo (#425 — approved/fired/rejected missing) Status: BLOCKED — #425 ops repo dirs needed for vault workflow
Objective: Ship (Fold 2) — Engagement measurement baked into deploy pipelines
- No engagement measurement exists
- No observables yet (AGENTS.md confirms) Status: BLOCKED — depends on deploy profiles + website observability (#426)
Objective: Ship (Fold 2) — Rent-a-human for gated channels
- run-rent-a-human formula exists
- Not yet exercised in production Status: READY
Objective: Ship (Fold 2) — Assumptions register
- No assumptions register exists Status: BLOCKED — not started
Objective: Learn (Fold 3) — Observable-driven planning
- No observables exist yet Status: BLOCKED — depends on Ship milestone (engagement measurement)
Objective: Learn (Fold 3) — Predictor challenges assumptions against signals
- Requires observables + assumptions register Status: BLOCKED — depends on Ship milestone
Objective: Learn (Fold 3) — Audience variation + signal detection
- Requires observables Status: BLOCKED — depends on Ship milestone