Planner Memory

Last updated: 2026-04-08

Run history

  • Run 1 (2026-04-05): First planning run. Established prerequisite tree from VISION.md.
  • Run 2 (2026-04-08): Foundation milestone completed. All 5 blockers resolved. Triaged 4 predictor predictions (all actioned). Filed #425 (ops repo migration) and #426 (website observability). Focus shifted to Adoption milestone.

Current constraint focus

  1. Ops repo migration (#425) — existing deployments missing evidence/, sprints/, portfolio.md, RESOURCES.md, vault subdirs. Blocks evidence collection for all agents. Priority+backlog.
  2. Website observability (#426) — disinto.ai has no analytics/measurement. Blocks Adoption landing page and Ship engagement measurement. Vision-level (design decisions needed).
  3. Example project — none exists. Blocked on bootstrap verification after #425.
  4. Deploy profiles — not started. Vision-level design needed for per-artifact-type deployment.
  5. Assumptions register — not started. Ship (Fold 2) prerequisite.

Patterns observed

  • Foundation milestone completed in ~10 days (2026-03-28 to 2026-04-08). High bug fix velocity once dev-agent pipeline was reliable.
  • Predictor-planner loop working: predictor filed 4 accurate predictions, planner actioned all 4. The adversarial feedback catches stale state and planner drift effectively.
  • Predictor correctly identified planner filing Fold 2/3 vision issues (#418, #419) while Foundation was incomplete — planner must verify milestone completion before advancing.
  • Ops repo structural debt: setup_ops_repo() creates dirs for new repos but doesn't migrate existing ones. Pattern will recur with future schema changes.
  • No observables exist — all 4 addressables (website, repo, skill, github org) lack measurement. This is the fundamental gap between Adoption and Ship.

Strategic direction

  • Foundation DONE. Adoption is now the active milestone.
  • #425 is the single blocking issue — once ops repo dirs exist, evidence collection unblocks and bootstrap is complete.
  • After #425: focus on example project (demonstrates full lifecycle) and website observability (#426).
  • Do NOT file Ship/Learn issues until Adoption objectives show progress. Predictor will check.
  • Graph report is healthy: 165 nodes, 137 edges, no cycles, no bottlenecks. 7 orphans are benign (closed issues, unused formulas/labels).