Foundation+ DONE, Adoption architect DONE, ops migration DONE. Filed #697 (example project). Updated tree and memory. Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
32 lines
2.9 KiB
Markdown
32 lines
2.9 KiB
Markdown
<!-- summarized-through-run: 4 -->
|
|
# Planner Memory
|
|
Last updated: 2026-04-11
|
|
|
|
## Run history
|
|
- Run 1 (2026-04-05): First planning run. Established prerequisite tree from VISION.md.
|
|
- Run 2 (2026-04-08): Foundation milestone completed. Triaged 4 predictor predictions. Filed #425, #426. Focus shifted to Adoption.
|
|
- Run 3 (2026-04-11): Infrastructure maturity work (#641-#652, #663, #669, #671, #682). Prerequisite tree updated with Foundation+ objective.
|
|
- Run 4 (2026-04-11): Foundation+ DONE (#647 closed). Adoption architect DONE (#689, #690 closed). Ops repo migration DONE (#688 closed — vault/evidence/sprints dirs exist). Filed #697 (example project). 0 predictions to triage.
|
|
|
|
## Current constraint focus
|
|
1. **Dev-poll deadlock** (#693) — in-progress bug, blocks dev agent reliability in same-container deployments. Being worked by dev-qwen.
|
|
2. **Website observability** (#426) — vision. disinto.ai has no analytics. Blocks Adoption landing page AND Ship engagement measurement. Two downstream objectives.
|
|
3. **Example project** (#697) — vision. Now unblocked by #688. Needs architect decomposition. Key Adoption deliverable and onboarding asset.
|
|
4. **Deploy profiles** — not started. Vision-level design needed. Blocks Ship milestone.
|
|
5. **Assumptions register** — not started. Blocks Ship milestone.
|
|
|
|
## Patterns observed
|
|
- Foundation milestone completed in ~10 days (2026-03-28 to 2026-04-08). Foundation+ completed in ~3 days (2026-04-08 to 2026-04-11). Infrastructure maturity accelerating.
|
|
- Predictor-planner loop working: 7 predictions triaged across runs 2-3, all actioned. No new predictions in run 4.
|
|
- Architect lifecycle now complete: #689 (close parent vision) and #690 (signature bug) both fixed. Architect can now decompose vision issues into sprints autonomously.
|
|
- Ops repo structural debt resolved: #688 closed, migrate_ops_repo() auto-triggers on startup. All canonical dirs present (vault/pending|approved|fired|rejected, evidence/*, sprints/).
|
|
- No observables exist — all addressables (website, repo, skill, github org) lack measurement. This remains the fundamental gap between Adoption and Ship.
|
|
- Graph healthy: 207 nodes, 240 edges, no cycles, no bottlenecks. Orphans are benign (closed issues, unused formulas/labels).
|
|
|
|
## Strategic direction
|
|
- Foundation and Foundation+ both DONE. Adoption is the active milestone.
|
|
- Three Adoption objectives DONE (Forgejo+CI, architect lifecycle, bootstrap infrastructure). Three remain: landing page (#426), example project (#697), bootstrap verification.
|
|
- #693 (dev-poll deadlock) is the only active bug — if resolved, dev pipeline is fully reliable.
|
|
- #697 and #426 are both vision-level — architect should decompose them into sprint issues.
|
|
- Do NOT file Ship/Learn issues until Adoption objectives show progress. Predictor will check.
|
|
- RESOURCES.md and portfolio.md are empty placeholders — low priority but should be populated as addressables/observables materialize.
|