6.9 KiB
6.9 KiB
Prerequisite Tree
Objective: Foundation — Core agent loop (dev → CI → review → merge)
- dev-agent picks up backlog issues (dev/dev-agent.sh exists)
- review-agent reviews PRs (review/review-pr.sh exists)
- CI integration with Woodpecker (lib/ci-helpers.sh exists)
- Stale in-progress recovery (#224 — closed)
- Agent race condition fix (#160 — closed)
- Dispatcher grep Alpine fix (#150 — closed) Status: DONE
Objective: Foundation — Supervisor health monitoring
- supervisor-run.sh exists and runs via cron
- preflight.sh collects health data Status: DONE
Objective: Foundation — Planner gap analysis against vision
- Planner formula exists (run-planner.toml v4)
- planner-run.sh cron wrapper exists
- Planning runs established (runs 1–7) Status: DONE
Objective: Foundation — Multi-project support
- Per-project TOML config (projects/*.toml)
- load-project.sh helper Status: DONE
Objective: Foundation — Knowledge graph for structural defect detection
- networkx package installed in agents container (#220 — closed)
- build-graph.py exists in lib/
- Graph report generating successfully (205 nodes, 287 edges as of 2026-04-14) Status: DONE
Objective: Foundation — Predictor-planner adversarial feedback loop
- Predictor formula exists (run-predictor.toml)
- Planner prediction triage step defined
- Prediction workflow labels created on Forgejo (#225 — closed)
- Predictor filing predictions (7 predictions triaged across runs 2-3) Status: DONE
--- FOUNDATION MILESTONE: DONE ---
Objective: Foundation+ — Infrastructure maturity
- CLAUDE_CONFIG_DIR rollout (#641-#646 — all closed)
- Credential handling cleanup (#669, #671 — closed)
- Agent profile/journal fixes (#651, #652, #663 — closed)
- Cron intervals configured (#682 — closed)
- Remove external flock (#647 — closed) Status: DONE
--- FOUNDATION+ MILESTONE: DONE ---
Objective: Adoption — One-command bootstrap (disinto init → disinto up)
- disinto init re-run stability (#158 — closed)
- disinto init repo creation API endpoint (#164 — closed)
- Prediction labels created during init (#225 — closed)
- Ops repo migration code merged (#425 — closed)
- Ops repo migration auto-triggers on agent startup (#688 — closed)
- End-to-end bootstrap verification with example project (#697 — vision, priority) Status: READY — migration works, needs end-to-end verification
Objective: Adoption — Built-in Forgejo + Woodpecker CI
- Docker compose with Forgejo + Woodpecker
- Woodpecker OAuth2 redirect URI fix (#172 — closed)
- WOODPECKER_HOST override fix (#178 — closed) Status: DONE
Objective: Adoption — Landing page communicating value proposition
- Website addressable exists (disinto.ai)
- Website observability (#426 — vision, priority, architect sprint in progress)
- Evidence/engagement directory setup (#747 — closed)
- Format-detection guard in collect-engagement.sh (#746 — closed)
- Collect-engagement formula + container script (#745 — backlog, priority)
- Rent-a-human instructions for Caddy host SSH key setup (#748 — backlog) Status: IN PROGRESS — architect decomposed #426 into sprint, 2/4 sub-issues closed
Objective: Adoption — Example project demonstrating full lifecycle
- Bootstrap path unblocked (#688 — closed)
- Example project design and implementation (#697 — vision, priority) Status: BLOCKED — #697 not yet decomposed by architect (false-completion from #735 bug pre-fix)
Objective: Adoption — Architect lifecycle completeness
- Architect closes parent vision issues when sprint sub-issues complete (#689 — closed)
- Architect-run.sh signature bug fixed (#690 — closed)
- Architect review response handling fixed (#718 — closed)
- Architect URL construction fixed (#717 — closed)
- Architect pitch output fixed (#716 — closed)
- Architect false-completion bug fixed (#735 — closed)
- close_vision_issue error handling (#737 — closed) Status: DONE
Objective: Adoption — Dev agent pipeline reliability
- Dev-poll deadlock in same-container case (#693 — closed)
- Profile journal digestion hang (#702 — closed)
- Dev-poll post-crash deadlock recovery (#749 — closed)
- Credential helper race on cold boot (#741 — closed)
- CI smoke test non-determinism fixed (#742 — closed, PR #754 merged)
- Entrypoint wait deadlock — serializes polling loop (#753 — in-progress, priority, PR #755 open) Status: IN PROGRESS — #753 is a critical infrastructure bug with open PR
Objective: Adoption — Assistant (disinto-chat) (#623)
- Caddy subpath routing skeleton (#704 — closed)
- Chat container scaffold (#705 — closed)
- Chat sandbox hardening (#706 — closed)
- Forgejo OAuth gate (#708 — closed)
- Caddy Remote-User forwarding + validation (#709 — closed)
- Cost caps + rate limiting (#711 — closed)
- Conversation history persistence (#710 — closed)
- Per-project subdomain fallback (#713 — closed)
- Claude identity isolation (#707 — backlog, CI blocker #742 now fixed)
- Escalation tools (#712 — backlog, priority, CI blocker #742 now fixed) Status: IN PROGRESS — 8/10 sub-issues closed, 2 ready for retry (CI root cause fixed)
Objective: Ship (Fold 2) — Deploy profiles per artifact type
- No deploy profiles defined
- CI pipeline working (Woodpecker OAuth fixed) Status: BLOCKED — not started, needs design (vision-level)
Objective: Ship (Fold 2) — Vault-gated fold transitions
- Vault redesign complete (#73-#77 — all closed)
- Vault PR workflow documented (docs/VAULT.md)
- Vault directories complete in ops repo (#688 — closed)
- Fold transition logic not implemented Status: BLOCKED — needs design for fold gate mechanics
Objective: Ship (Fold 2) — Engagement measurement baked into deploy pipelines
- Website observability sprint in progress (#426)
- No other observables yet Status: BLOCKED — depends on #426 completion + deploy profiles
Objective: Ship (Fold 2) — Rent-a-human for gated channels
- run-rent-a-human formula exists
- First exercise: Caddy SSH key setup (#748 — will produce rent-a-human instructions) Status: READY
Objective: Ship (Fold 2) — Assumptions register
- No assumptions register exists Status: BLOCKED — not started
Objective: Learn (Fold 3) — Observable-driven planning
- No observables exist yet Status: BLOCKED — depends on Ship milestone (engagement measurement)
Objective: Learn (Fold 3) — Predictor challenges assumptions against signals
- Requires observables + assumptions register Status: BLOCKED — depends on Ship milestone
Objective: Learn (Fold 3) — Audience variation + signal detection
- Requires observables Status: BLOCKED — depends on Ship milestone