Planner Memory

Last updated: 2026-04-11

Run history

  • Run 1 (2026-04-05): First planning run. Established prerequisite tree from VISION.md.
  • Run 2 (2026-04-08): Foundation milestone completed. Triaged 4 predictor predictions. Filed #425, #426. Focus shifted to Adoption.
  • Run 3 (2026-04-11): Infrastructure maturity work (#641-#652, #663, #669, #671, #682). Prerequisite tree updated with Foundation+ objective.
  • Run 4 (2026-04-11): Foundation+ DONE (#647 closed). Adoption architect DONE (#689, #690 closed). Ops repo migration DONE (#688 closed). Filed #697 (example project). 0 predictions to triage.
  • Run 5 (2026-04-11): #693 (dev-poll deadlock) closed — dev pipeline reliability nearly DONE. #702 (journal hang on Qwen) new bug, in-progress. #665 (edge cold start) promoted to backlog. Priority added to #426, #697. 0 predictions to triage.

Current constraint focus

  1. Website observability (#426) — vision, priority. disinto.ai has no analytics. Blocks Adoption landing page AND Ship engagement measurement. Two downstream objectives. Longest-standing constraint.
  2. Example project (#697) — vision, priority. Needs architect decomposition. Key Adoption deliverable and onboarding asset.
  3. Edge cold-start crash (#665) — backlog. Edge container clones from forgejo before forgejo is ready. Blocks clean bootstrap. Simple fix (retry/wait loop).
  4. Profile journal hang (#702) — in-progress. Journal digestion hangs on local Qwen with many entries. Affects dev-agent reliability.
  5. Deploy profiles — not started. Vision-level design needed. Blocks Ship milestone.

Patterns observed

  • Foundation completed in ~10 days, Foundation+ in ~3 days. Infrastructure maturity accelerating.
  • Predictor-planner loop working: 7 predictions triaged across runs 2-3. No new predictions in runs 4-5. Either predictor interval is too infrequent or system is stable.
  • Architect lifecycle complete (#689, #690 fixed). Can autonomously decompose vision issues into sprints.
  • Dev pipeline nearly reliable: #693 deadlock fixed. #702 (Qwen journal hang) is the remaining operational issue.
  • No observables exist — all addressables (website, repo, skill, github org) lack measurement. Fundamental gap between Adoption and Ship.
  • Graph healthy: 206 nodes, 246 edges, no cycles, no bottlenecks. Orphans are benign.
  • Massive fix velocity: 30+ issues closed 2026-04-10 to 2026-04-11 (infrastructure, credential, profile, entrypoint fixes).

Strategic direction

  • Foundation and Foundation+ both DONE. Adoption is the active milestone.
  • Four Adoption objectives DONE (Forgejo+CI, architect lifecycle, bootstrap infrastructure, dev pipeline reliability). Three remain: landing page (#426), example project (#697), bootstrap cold-start (#665).
  • #426 and #697 are both vision-level — architect should decompose them into sprint issues. Both now have priority label.
  • #665 is a simple bug now in backlog — should be picked up by next dev-agent run.
  • #702 is being actively worked — monitor but don't interfere.
  • Do NOT file Ship/Learn issues until Adoption objectives show progress.
  • RESOURCES.md and portfolio.md remain empty placeholders — populate as addressables/observables materialize.