Run history

  • Run 1 (2026-04-05): First planning run. Established prerequisite tree from VISION.md.
  • Run 2 (2026-04-08): Foundation milestone completed. Triaged 4 predictor predictions. Filed #425, #426.
  • Run 3 (2026-04-11): Infrastructure maturity work (#641-#652, #663, #669, #671, #682).
  • Run 4 (2026-04-11): Foundation+ DONE. Adoption architect DONE (#689, #690). Ops migration DONE (#688). Filed #697.
  • Run 5 (2026-04-12): Dev pipeline reliability DONE (#693, #702 closed). Chat 8/10 (#710, #713 closed). Found architect false-completion bug → filed #735. 0 predictions.
  • Run 6 (2026-04-12): #735 CLOSED (architect false-completion bug). #737 NEW tech-debt (close_vision_issue error handling). Relabeled #707, #712 blocked→backlog for ci_exhausted retry. Added priority+backlog to #737. 0 predictions. 0 new issues filed.
  • Run 7 (2026-04-14): #737 CLOSED, #741 CLOSED. Architect decomposed #426 into sprint (4 sub-issues #745-#748). Labeled all sub-issues backlog. Created vault pending item for SSH key. #749 new bug (dev-poll post-crash deadlock, in-progress). #742 CI exhaustion investigation in-progress. #707/#712 re-blocked pending #742. 0 predictions. 0 new issues filed.

Current constraint focus

  1. Website observability sprint (#426) — architect decomposed. #747 (evidence dir, priority) → #745 (formula) → #746 (format guard). #748 (SSH docs) parallel. SSH key blocked-on-vault. First factory observable in progress.
  2. Dev-poll post-crash deadlock (#749) — in-progress, dev-bot. Self-assigned issues not recovered after container crash. Same class as #741 (startup state vs Forgejo state).
  3. CI exhaustion investigation (#742) — in-progress, dev-qwen. Blocks #707/#712 (last 2 chat sub-issues for #623).
  4. Example project (#697) — vision, priority. Awaiting architect decomposition. Architect should pick up next run.
  5. Deploy profiles — not started. Vision-level. Blocks Ship milestone. Do not file until Adoption shows more progress.

Patterns observed

  • Foundation completed in ~10 days, Foundation+ in ~3 days, dev pipeline reliability in ~1 day. Execution velocity increasing.
  • Architect lifecycle fully operational: decomposed #426 into clean sprint with 4 sub-issues. First successful end-to-end architect cycle since bug fixes (#716-#718, #735, #737).
  • Cold-boot resilience is a recurring theme: #741 (credential race), #749 (self-assigned deadlock). Both are startup-state-vs-Forgejo-state reconciliation bugs.
  • Chat assistant (#623) 8/10 done. Final 2 (#707, #712) blocked on CI investigation (#742). If #742 resolves, chat could complete quickly.
  • No predictor activity (0 predictions in runs 4-7). Stable system or quiet predictor.
  • Graph grew: 206→213 nodes, 271→289 edges. No cycles, no bottlenecks.
  • First observable in progress — #426 decomposition is the first concrete step toward measurement. Fundamental gap being addressed.

Strategic direction

  • Adoption is the active milestone. 6 of 8 Adoption objectives DONE (Architect lifecycle now DONE with #737 closed).
  • Critical path: #747 → #745 → #746 (website observability chain) + vault SSH key provisioning. This is the path to the factory's first observable.
  • #697 needs architect decomposition — should happen on next architect run.
  • #749 and #742 are active reliability work — let them complete.
  • Do NOT file Ship/Learn issues until website observability is wired (#426 chain completes).