fix: vision(#623): end-to-end subpath routing smoke test for Forgejo + Woodpecker + chat (#1025) #1046

Closed
dev-qwen2 wants to merge 5 commits from fix/issue-1025-1 into main
Collaborator

Fixes #1025

Changes

Fixes #1025 ## Changes
dev-qwen2 added 1 commit 2026-04-19 15:59:17 +00:00
disinto-admin added 1 commit 2026-04-19 16:35:57 +00:00
fix: escape $ in .woodpecker/edge-subpath.yml bash array expansion
Some checks failed
ci/woodpecker/push/ci Pipeline was successful
ci/woodpecker/pr/ci Pipeline failed
ci/woodpecker/pr/edge-subpath Pipeline failed
ci/woodpecker/pr/smoke-init Pipeline was successful
097e7e5120
Woodpecker YAML preprocessor reads ${...} as its own variable
substitution and fails on bash array expansion "${ARR[@]}" with
"missing closing brace". Escape as $${...} so Woodpecker emits
a literal $ to the shell.

Fixes CI pipeline error=generic "missing closing brace" on
pipelines #1408 and #1409.
dev-qwen2 added 1 commit 2026-04-19 17:19:07 +00:00
fix: add --base-url CLI option to smoke-edge-subpath.sh for flexible BASE_URL handling
Some checks failed
ci/woodpecker/push/ci Pipeline was successful
ci/woodpecker/pr/ci Pipeline failed
ci/woodpecker/pr/edge-subpath Pipeline failed
ci/woodpecker/pr/smoke-init Pipeline failed
da7bd91bb4
dev-qwen2 force-pushed fix/issue-1025-1 from da7bd91bb4 to e99604b7dc 2026-04-19 17:21:16 +00:00 Compare
dev-qwen2 added 1 commit 2026-04-19 17:24:35 +00:00
fix: download caddy binary in CI for validate step
Some checks failed
ci/woodpecker/push/ci Pipeline was successful
ci/woodpecker/pr/ci Pipeline failed
ci/woodpecker/pr/edge-subpath Pipeline failed
ci/woodpecker/pr/smoke-init Pipeline failed
558027f097
dev-qwen2 added 1 commit 2026-04-19 17:27:51 +00:00
fix: fix when clause format for Woodpecker pipeline
Some checks failed
ci/woodpecker/push/ci Pipeline was successful
ci/woodpecker/pr/ci Pipeline failed
ci/woodpecker/pr/edge-subpath Pipeline failed
ci/woodpecker/pr/smoke-init Pipeline was successful
315b0f10bd
disinto-admin closed this pull request 2026-04-19 19:08:57 +00:00
Some checks failed
ci/woodpecker/push/ci Pipeline was successful
Required
Details
ci/woodpecker/pr/ci Pipeline failed
Required
Details
ci/woodpecker/pr/edge-subpath Pipeline failed
ci/woodpecker/pr/smoke-init Pipeline was successful

Pull request closed

Sign in to join this conversation.
No reviewers
No milestone
No project
No assignees
2 participants
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set.

Reference: disinto-admin/disinto#1046
No description provided.