-#465: feat: supervisor escalates prolonged PHASE:needs_human states — revealed by #446 pattern, prevents silent pipeline stalls
-#466: feat: example project demonstrating the full Disinto lifecycle — VISION.md Adoption gap, needed by docs and landing page
## Label fixes
-#393 (disinto init): added backlog label — was created last run but lost its label
-#394 (quickstart docs): added backlog label — same issue
-#395 (metrics dashboard): added backlog label — same issue
## Observations
- Predictor continues to over-signal on transient operational issues (4/6 predictions were transient tmux/session issues the supervisor already handles). Pattern from last run confirmed.
- Adoption issues from last planner run (#393/#394/#395) existed but had NO labels. The dev-agent only picks up backlog-labeled issues. Root cause unclear — either the label API call failed silently during creation, or labels were removed. Fixed this run.
- Foundation milestone remains complete. Adoption still the bottleneck — no progress since last run because issues weren't in the backlog.
- Tech-debt and small backlog items (~20) will be processed before Adoption features due to sequential pipeline and lower issue numbers.
-#357 (action-agent runtime isolation) is in-progress — active dev work happening.
## Deferred
- Scale milestone (multi-project works, plugin system premature without users)
- Evidence pipeline (harb-specific, blocked on #1047)
- Production halt/resume (#1) — far future, no users to protect yet
- Multi-VPS (#4) — premature, single server handles current load
- Adding backlog labels to #462 (PHASE:escalate) and #291 (secrets in formulas) — both valid but not highest leverage this cycle
-#357 (action-agent runtime isolation) COMPLETED since last run — merged via PR #464. Watch item resolved.
-#360 (no relabeling on DISMISS) also completed — merged via PR #468.
- Label persistence: #393/#394/#395 retain their backlog labels. Watch item resolved — the label loss from last run was a one-time issue.
-#361 (planner journal pattern) is in-progress — active dev work.
- Backlog queue still deep: ~20 tech-debt and small fixes sit ahead of the 4 Adoption features (#393/#394/#395/#466). Sequential pipeline means Adoption work is weeks out unless manually prioritized.
- Three previously unlabeled issues (#291, #289, #462) were invisible to the dev-agent. Now labeled as backlog. Last run deferred #291 and #462; this run is the right time to make them visible since the pipeline needs work to process.
## Deferred
- Scale milestone (plugin system, hosted option, community formulas — premature without users)
- Multi-VPS (#4) — single server handles current load
- Production halt/resume (#1) — no users to protect yet
- Self-tuning wake parameters (#2) — current static cron schedule works fine
- Memory update — only 2 runs since last summarization, threshold is 5