chore: planner run 2026-03-25
- Triaged 6 predictions: 2 promoted (#663, #664), 1 watched, 3 dismissed - Updated prerequisite tree: #568 DONE, #466 ESCALATED, added operational reliability objective - Filed 3 issues: #663 (guard logging), #664 (stale phase cleanup), #668 (init smoke test) - Prioritized top 5 constraints: #466, #661, #663, #664, #668
This commit is contained in:
parent
47fd876813
commit
b7976fcce4
2 changed files with 68 additions and 5 deletions
53
planner/journal/2026-03-25.md
Normal file
53
planner/journal/2026-03-25.md
Normal file
|
|
@ -0,0 +1,53 @@
|
||||||
|
# Planner run — 2026-03-25 07:15 UTC
|
||||||
|
|
||||||
|
## Predictions triaged
|
||||||
|
- #656: DISMISS — planning deadlock is resolved by this run; tree staleness corrected
|
||||||
|
- #655: PROMOTE_BACKLOG → #663 — check_active guard should log when skipping
|
||||||
|
- #644: WATCH — disk P1 reactive cleanup works; not urgent enough for backlog slot
|
||||||
|
- #643: PROMOTE_BACKLOG → #664 — supervisor should clean stale phase files for closed issues
|
||||||
|
- #642: DISMISS — HTTP 401 likely caused by #653 (wrong remote), now fixed
|
||||||
|
- #640: DISMISS — all 5 bootstrap failures (#634-638) closed; remaining fixes in pipeline
|
||||||
|
|
||||||
|
## Prerequisite tree updates
|
||||||
|
- Resolved: #568 (merge guard) moved from BLOCKED to DONE — was closed but tree was stale
|
||||||
|
- Resolved: bootstrap hardening issues #634-638, #652, #653, #658 all closed
|
||||||
|
- Discovered: #660 (Forgejo reachability) and #661 (Woodpecker CI wiring) as remaining init prerequisites
|
||||||
|
- Added: new objective "Factory operational reliability" with #663 and #664
|
||||||
|
- Added: #668 (end-to-end init smoke test) as init prerequisite
|
||||||
|
- Status change: #466 marked ESCALATED (bounced + gardener escalation, awaiting human decision)
|
||||||
|
|
||||||
|
## Top 5 constraints
|
||||||
|
1. #466 — example project — blocks Adoption completion — ESCALATED, awaiting human decision
|
||||||
|
2. #661 — Woodpecker CI wiring — blocks init completeness — in backlog with priority
|
||||||
|
3. #668 — init smoke test — blocks init quality assurance — filed this run
|
||||||
|
4. #663 — guard logging — prevents invisible agent dropouts — filed this run (from #655)
|
||||||
|
5. #664 — stale phase cleanup — reduces supervisor signal noise — filed this run (from #643)
|
||||||
|
|
||||||
|
## Stuck issues detected
|
||||||
|
- #466: BOUNCED (1x, "too large for single session") + ESCALATED (gardener: "needs human decision on approach") — added comment noting escalation seen, suggested option (b) local demo may be viable
|
||||||
|
|
||||||
|
## Issues created
|
||||||
|
- #663: fix: check_active guard should log to stderr when skipping (from prediction #655)
|
||||||
|
- #664: fix: supervisor should clean up stale PHASE:escalate files (from prediction #643)
|
||||||
|
- #668: feat: end-to-end disinto init smoke test in CI (new constraint — init quality)
|
||||||
|
|
||||||
|
## Priority label changes
|
||||||
|
- Added priority: #661, #663, #664, #668 (top constraints)
|
||||||
|
- Kept priority: #466 (still #1 constraint, though escalated)
|
||||||
|
- No priority removed (only #466 had it previously)
|
||||||
|
|
||||||
|
## Observations
|
||||||
|
- Massive progress since last run (2026-03-23): ~30 issues closed in 48h. Bootstrap hardening wave (#634-638, #652, #653, #658) completed. Full stack containerized (#618, #619).
|
||||||
|
- Planner missed 2026-03-24 run due to active-state guard deploy gap (#655). State files created 21h after guard merged. No visible signal of the missed run.
|
||||||
|
- Factory nearly idle: 1 in-progress (#660), 1 backlog (#661), plus 3 newly filed. After current pipeline clears, #466 is the only Adoption item left.
|
||||||
|
- Adoption milestone 4/5 complete. #466 is stuck on human decision (external vs local demo). The containerized stack work makes option (b) viable — suggested in comment.
|
||||||
|
- #568 (merge guard) was marked BLOCKED in tree but actually closed — 2-day stale tree from missed planner run.
|
||||||
|
- Predictor signal quality: 6 predictions, all substantive. 2 promoted, 1 watched, 3 dismissed. Better signal-to-noise than earlier runs.
|
||||||
|
- RESOURCES.md unchanged. Vault empty (no procurement requests).
|
||||||
|
|
||||||
|
## Deferred (in tree, not filed)
|
||||||
|
- Scale: plugin system, community formulas, hosted option — premature without users
|
||||||
|
- Vision items: #1 (halt/resume), #2 (self-tuning), #4 (multi-VPS) — far future
|
||||||
|
- Prediction #644 (disk P1): watching, reactive cleanup works
|
||||||
|
- Prediction #580 (Caddy CVEs): still in prediction/backlog, static site mitigates
|
||||||
|
- Prediction #529 (swap 57%): stable, not trending worse
|
||||||
|
|
@ -1,5 +1,5 @@
|
||||||
# Prerequisite Tree
|
# Prerequisite Tree
|
||||||
<!-- Last updated: 2026-03-23 -->
|
<!-- Last updated: 2026-03-25 -->
|
||||||
|
|
||||||
## Objective: One-command bootstrap — `disinto init` (#393)
|
## Objective: One-command bootstrap — `disinto init` (#393)
|
||||||
- [x] Core agent loop stable (Foundation)
|
- [x] Core agent loop stable (Foundation)
|
||||||
|
|
@ -7,7 +7,11 @@
|
||||||
- [x] Guard allows formula agents in worktrees (#487)
|
- [x] Guard allows formula agents in worktrees (#487)
|
||||||
- [x] Bundled dust cleanup — set-euo-pipefail (#516)
|
- [x] Bundled dust cleanup — set-euo-pipefail (#516)
|
||||||
- [x] Agent-session.sh pre-register worktree trust (#514)
|
- [x] Agent-session.sh pre-register worktree trust (#514)
|
||||||
Status: DONE — #393 closed
|
- [x] Bootstrap hardening — Forgejo INSTALL_LOCK (#634), su-exec (#635), admin user (#636), DNS (#637), crontab (#638), auth (#652), remote target (#653), token creation (#658)
|
||||||
|
- [ ] Agents container reaches Forgejo — env.sh override (#660) — in-progress
|
||||||
|
- [ ] Woodpecker CI wiring during init (#661) — in backlog
|
||||||
|
- [ ] End-to-end init smoke test (#668) — in backlog
|
||||||
|
Status: DONE (code merged) — hardening fixes landing, smoke test pending
|
||||||
|
|
||||||
## Objective: Documentation site with quickstart (#394)
|
## Objective: Documentation site with quickstart (#394)
|
||||||
- [x] disinto init working (#393)
|
- [x] disinto init working (#393)
|
||||||
|
|
@ -20,7 +24,8 @@ Status: DONE — #395 closed
|
||||||
|
|
||||||
## Objective: Example project demonstrating full lifecycle (#466)
|
## Objective: Example project demonstrating full lifecycle (#466)
|
||||||
- [x] disinto init working (#393)
|
- [x] disinto init working (#393)
|
||||||
Status: READY — issue in backlog with priority
|
- [ ] Human decision on implementation approach (external repo vs local demo) ⚠ escalated — awaiting human decision
|
||||||
|
Status: BLOCKED — bounced by dev-agent (too large), escalated by gardener (2026-03-23), awaiting human decision
|
||||||
|
|
||||||
## Objective: Landing page communicating value proposition (#534)
|
## Objective: Landing page communicating value proposition (#534)
|
||||||
- [x] disinto init working (#393)
|
- [x] disinto init working (#393)
|
||||||
|
|
@ -29,8 +34,8 @@ Status: READY — issue in backlog with priority
|
||||||
Status: DONE — #534 closed
|
Status: DONE — #534 closed
|
||||||
|
|
||||||
## Objective: Autonomous PR merge pipeline (#568)
|
## Objective: Autonomous PR merge pipeline (#568)
|
||||||
- [ ] PreToolUse guard allows merge API calls from phase-handler (#568)
|
- [x] PreToolUse guard allows merge API calls from phase-handler (#568)
|
||||||
Status: BLOCKED — every PR merge escalates; backlog+priority labeled
|
Status: DONE — #568 closed
|
||||||
|
|
||||||
## Objective: Unified escalation path (#510)
|
## Objective: Unified escalation path (#510)
|
||||||
- [x] PHASE:escalate replaces PHASE:needs_human (supersedes #465)
|
- [x] PHASE:escalate replaces PHASE:needs_human (supersedes #465)
|
||||||
|
|
@ -40,3 +45,8 @@ Status: DONE — #510 closed
|
||||||
- [x] RESOURCES.md exists
|
- [x] RESOURCES.md exists
|
||||||
- [x] Vault poll scripts deployed (vault-poll.sh)
|
- [x] Vault poll scripts deployed (vault-poll.sh)
|
||||||
Status: DONE — #504 closed
|
Status: DONE — #504 closed
|
||||||
|
|
||||||
|
## Objective: Factory operational reliability
|
||||||
|
- [ ] check_active guard logs when skipping (#663) — in backlog
|
||||||
|
- [ ] Supervisor cleans stale PHASE:escalate files (#664) — in backlog
|
||||||
|
Status: BLOCKED — 2 prerequisites unresolved
|
||||||
|
|
|
||||||
Loading…
Add table
Add a link
Reference in a new issue