do_merge() is defined at line 876, but recovery mode calls it at
line ~498. Bash requires functions to be defined before use.
Inlined the merge→rebase→re-approve→retry logic directly.
1. Recovery mode: if PR already has approval + green CI, try merge
immediately instead of entering the review wait loop forever.
2. do_merge: on 405/merge failure, rebase → force push → wait CI →
re-approve via review_bot → retry merge. Covers the stale-approval
dismissal problem end-to-end.
3. Codeberg mergeable field is unreliable — rebase on any merge failure.
Codeberg's mergeable field flickers between true/false — unreliable
for deciding whether to rebase. Just attempt rebase on any non-200/204.
Worst case it's a no-op. Also added git fetch before rebase.
- Remove write_state_entry/append_state_log from dev-agent (#10)
- Add planner-agent.sh: rebuilds STATE.md from git history + closed
issues, then gap-analyses against VISION.md to create backlog
issues (#6, #7)
- Add planner-poll.sh: cron wrapper with lock + memory guard
STATE.md is now solely owned by the planner — one compact snapshot
rebuilt each run, not an ever-growing append log.
Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>
When merge returns non-200, check mergeable flag. If false,
rebase the PR branch onto master via worktree. If rebase fails,
spawn dev-agent to resolve. Prevents infinite 405 retry loops.
Extracted try_merge_or_rebase() helper used at all 3 merge points.
Add matrix_send() to lib/env.sh and matrix_listener.sh daemon for
real-time notifications, threaded escalations, and human-in-the-loop
replies. All agents now notify via Matrix instead of openclaw.
Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>
PRs #684 and #710 had no issue number in branch name or title.
Now also checks PR body for 'Closes #NNN'. If still no issue found,
logs a skip (dev-agent requires an issue number to work).
PRs with custom branch names (fix/fitness-factory-address,
chore/seed-consolidation) were invisible to priority 1.5.
Now also extracts issue number from PR title (#NNN) as fallback.
Function was defined at line 867 but called at line 550. Bash requires
functions to be defined before invocation. Moved to top with other
helpers. Also removed duplicate definition.
1. PRIORITY 1.5 in dev-poll: scan ALL open PRs for REQUEST_CHANGES or CI
failure before picking new backlog issues. Stuck PRs get fixed first
to avoid complex rebases piling up.
2. STATE.md written in worktree before claude starts (included in first
commit, not a separate push that dismisses stale approvals).
3. Removed HTTP 405 from merge success check in dev-poll.sh (was fixed
in dev-agent.sh but not here — 2 occurrences).
When PR has merge conflicts (mergeable=false), attempt git rebase
before merge. If rebase fails, abort and escalate via notify.
Flow: approval → check mergeable → rebase if needed → wait CI → merge
Resolves the serial seed PR bottleneck where append-only files
(manifest.jsonl) create trivial conflicts that block the pipeline.
Root cause: Two bugs combined to silently close PRs without merging.
1. HTTP 405 ('not allowed to merge') was in the success condition
alongside 200/204. Codeberg returns 405 when branch protection
blocks the merge (e.g., stale approvals).
2. append_state_log pushed a new commit AFTER review_bot approved,
but BEFORE the merge attempt. With dismiss_stale_approvals=true,
the new commit automatically dismissed the approval → 405.
Impact: 6 PRs (#683, #688, #692, #695, #696, #699) were 'merged'
(logged as success, branch deleted, issue closed) but never actually
merged into master. All work was lost.
Fixes:
- Remove 405 from merge success check
- Move STATE.md append out of pre-merge path
The merged-PR search was over-engineered and caused false negatives
(couldn't match PR to issue when title/body didn't contain #NNN).
Issue closed = dep satisfied. Factory only closes after merging.
Codeberg uses shared issue/PR numbering. When a PR IS the dep issue
(e.g. PR #665 fixes issue #665), the title search misses it.
Fallback checks if pulls/{dep_num} is merged.
Moved from dark-factory to harb. Dev-agent appends one line to
STATE.md on the PR branch right before merge — goes through
review like any other change.
After each successful PR merge, dev-agent appends one line to
STATE.md: - [date] what now exists (#PR)
Lives in dark-factory repo (harb master is protected).
Planner will collapse this into a compact snapshot later.
When dev-agent exhausts CI fix budget, writes escalation marker.
Supervisor picks it up next poll and invokes claude -p to diagnose
(flaky test? rate limit? real bug?) and decide: fix, close PR, or
escalate to human.
- Moved ci-debug.sh from dev/ to lib/ (shared utility)
- README: fixed supervisor description (all alerts go to claude)
- README: replaced implementation details with actual design principles