55 lines
3.9 KiB
Markdown
55 lines
3.9 KiB
Markdown
|
|
# Planner run — 2026-03-26 07:15 UTC
|
||
|
|
|
||
|
|
## Predictions triaged
|
||
|
|
- #644: DISMISS — disk P1 handled by supervisor reactive cleanup, no persistent issue
|
||
|
|
- #580: DISMISS — Caddy CVEs don't apply to static site (no FastCGI/PHP)
|
||
|
|
- #529: DISMISS — swap stable at 57%, supervisor monitors, not trending worse
|
||
|
|
- #446: DISMISS — root cause fixed by #465/#510 escalation path improvements
|
||
|
|
All 4 were prediction/backlog → migrated to prediction/dismissed per #686 policy. Created prediction/dismissed label (was missing).
|
||
|
|
|
||
|
|
## Prerequisite tree updates
|
||
|
|
- Resolved: #660 (Forgejo reachability), #661 (Woodpecker CI wiring), #668 (init smoke test), #663 (guard logging), #664 (stale phase cleanup) — all closed
|
||
|
|
- Objectives completed: bootstrap (#393) now FULLY DONE (all prereqs resolved), factory operational reliability DONE
|
||
|
|
- New objectives added: exec agent (#699) DONE, rent-a-human (#679) DONE, skill package distribution (#710-#712), observable addressables (#718)
|
||
|
|
- Discovered: #710-#715 skill package initiative (created since last run), with #714/#715 as duplicates of #710/#711
|
||
|
|
|
||
|
|
## Top 5 constraints
|
||
|
|
1. #466 — example project — blocks Adoption completion — ESCALATED 3 days, no human response
|
||
|
|
2. #710 — skill package creation — enables distribution — in backlog with priority
|
||
|
|
3. #718 — observable addressables — Ship milestone bridge — filed this run
|
||
|
|
4. #714/#715 — duplicate issues — pending gardener cleanup
|
||
|
|
5. prediction/backlog label — should be deleted per #686 — needs admin action
|
||
|
|
|
||
|
|
## Stuck issues detected
|
||
|
|
- #466: ESCALATED (since 2026-03-23, 3 days) — no human response. Dev-agent bounced as too large, gardener escalated for approach decision. Not re-promoting — already has priority label.
|
||
|
|
|
||
|
|
## Issues created
|
||
|
|
- #718: feat: observable addressables — engagement measurement for deployed artifacts — Ship milestone, Fold 2→3 bridge
|
||
|
|
|
||
|
|
## Priority label changes
|
||
|
|
- Added priority: #710 (next ready pipeline work)
|
||
|
|
- Kept priority: #466 (still #1 constraint, escalated)
|
||
|
|
- No priority removed
|
||
|
|
|
||
|
|
## Label changes
|
||
|
|
- #710, #711, #712, #713: added backlog (were unlabeled, invisible to pipeline)
|
||
|
|
- #644, #580, #529, #446: relabeled from prediction/backlog to prediction/dismissed, closed
|
||
|
|
- Created prediction/dismissed label (id: 1335444) — missing despite #686 implementation
|
||
|
|
|
||
|
|
## Observations
|
||
|
|
- Explosive progress continues: ~30 issues closed since last run (2026-03-25). Bootstrap fully hardened, init smoke test passing, exec agent deployed, rent-a-human implemented.
|
||
|
|
- Factory nearly idle: no backlog items existed until this run labeled #710-#713. The skill package chain is the only ready work.
|
||
|
|
- Skill package initiative (#710-#715) appeared since last run — created from #709 research. Two parallel tracks with duplicates (#710/#714, #711/#715). Preferred #710 chain, flagged duplicates for gardener.
|
||
|
|
- Adoption milestone 4/5 complete. #466 stuck 3 days on human decision. All technical prerequisites resolved. The human bottleneck is real.
|
||
|
|
- Ship milestone entering scope: #679 (rent-a-human) and #699 (exec agent) already done. #718 (observable addressables) filed. Deploy profiles and assumptions register remain untracked.
|
||
|
|
- VISION.md updated this cycle (3c97ddb) — factory primitives (resources, addressables, observables) now formally defined. Tree reflects this.
|
||
|
|
- RESOURCES.md unchanged. Vault empty (no procurement requests).
|
||
|
|
- Graph report clean: no cycles, no bottlenecks. Orphan issues are all closed bug fixes — expected.
|
||
|
|
|
||
|
|
## Deferred (in tree, not filed)
|
||
|
|
- Ship: deploy profiles per artifact type — premature until skill package or example project demonstrates need
|
||
|
|
- Ship: assumptions register — needs design decision on format
|
||
|
|
- Ship: vault-gated fold transitions — vault infrastructure exists, fold logic not yet designed
|
||
|
|
- Scale: plugin system, community formulas, hosted option — premature without users
|
||
|
|
- Vision items: #1 (halt/resume), #2 (self-tuning), #4 (multi-VPS) — far future
|