disinto/planner/journal/2026-03-26.md
2026-03-26 07:18:30 +00:00

3.9 KiB

Planner run — 2026-03-26 07:15 UTC

Predictions triaged

  • #644: DISMISS — disk P1 handled by supervisor reactive cleanup, no persistent issue
  • #580: DISMISS — Caddy CVEs don't apply to static site (no FastCGI/PHP)
  • #529: DISMISS — swap stable at 57%, supervisor monitors, not trending worse
  • #446: DISMISS — root cause fixed by #465/#510 escalation path improvements All 4 were prediction/backlog → migrated to prediction/dismissed per #686 policy. Created prediction/dismissed label (was missing).

Prerequisite tree updates

  • Resolved: #660 (Forgejo reachability), #661 (Woodpecker CI wiring), #668 (init smoke test), #663 (guard logging), #664 (stale phase cleanup) — all closed
  • Objectives completed: bootstrap (#393) now FULLY DONE (all prereqs resolved), factory operational reliability DONE
  • New objectives added: exec agent (#699) DONE, rent-a-human (#679) DONE, skill package distribution (#710-#712), observable addressables (#718)
  • Discovered: #710-#715 skill package initiative (created since last run), with #714/#715 as duplicates of #710/#711

Top 5 constraints

  1. #466 — example project — blocks Adoption completion — ESCALATED 3 days, no human response
  2. #710 — skill package creation — enables distribution — in backlog with priority
  3. #718 — observable addressables — Ship milestone bridge — filed this run
  4. #714/#715 — duplicate issues — pending gardener cleanup
  5. prediction/backlog label — should be deleted per #686 — needs admin action

Stuck issues detected

  • #466: ESCALATED (since 2026-03-23, 3 days) — no human response. Dev-agent bounced as too large, gardener escalated for approach decision. Not re-promoting — already has priority label.

Issues created

  • #718: feat: observable addressables — engagement measurement for deployed artifacts — Ship milestone, Fold 2→3 bridge

Priority label changes

  • Added priority: #710 (next ready pipeline work)
  • Kept priority: #466 (still #1 constraint, escalated)
  • No priority removed

Label changes

  • #710, #711, #712, #713: added backlog (were unlabeled, invisible to pipeline)
  • #644, #580, #529, #446: relabeled from prediction/backlog to prediction/dismissed, closed
  • Created prediction/dismissed label (id: 1335444) — missing despite #686 implementation

Observations

  • Explosive progress continues: ~30 issues closed since last run (2026-03-25). Bootstrap fully hardened, init smoke test passing, exec agent deployed, rent-a-human implemented.
  • Factory nearly idle: no backlog items existed until this run labeled #710-#713. The skill package chain is the only ready work.
  • Skill package initiative (#710-#715) appeared since last run — created from #709 research. Two parallel tracks with duplicates (#710/#714, #711/#715). Preferred #710 chain, flagged duplicates for gardener.
  • Adoption milestone 4/5 complete. #466 stuck 3 days on human decision. All technical prerequisites resolved. The human bottleneck is real.
  • Ship milestone entering scope: #679 (rent-a-human) and #699 (exec agent) already done. #718 (observable addressables) filed. Deploy profiles and assumptions register remain untracked.
  • VISION.md updated this cycle (3c97ddb) — factory primitives (resources, addressables, observables) now formally defined. Tree reflects this.
  • RESOURCES.md unchanged. Vault empty (no procurement requests).
  • Graph report clean: no cycles, no bottlenecks. Orphan issues are all closed bug fixes — expected.

Deferred (in tree, not filed)

  • Ship: deploy profiles per artifact type — premature until skill package or example project demonstrates need
  • Ship: assumptions register — needs design decision on format
  • Ship: vault-gated fold transitions — vault infrastructure exists, fold logic not yet designed
  • Scale: plugin system, community formulas, hosted option — premature without users
  • Vision items: #1 (halt/resume), #2 (self-tuning), #4 (multi-VPS) — far future